SHRIPAD DESHMUKH AND ASSOCIATES ENGINEER'S AND CONSULTANT FORM-2 . See Regulation 31 ENGINEERS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated. account - Protect Wise) Date: 07/07/2026 To The Gopal Ajmera Cha. Sambhajinagar, 431010 Subject: Certificate of Cost [incurred for Development of [ABK Aurix ] having MahaRERA Registration Number P51500077895 (Only Applicable after project Registration) being developed by Mr. Gopal Ajmera [Pronmoter's Name] Sir, L Shripad Deshmukh have undetaken assignment of certifying Estimated Cost for having MahRERA Registration Number P51500077895 (only applicable after project Registration being developed by [Promoter's Name] 2. We have estimated the cost of Civil, MEP and allied works required for compłetion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in attachment of sale. Our estimated cost calculations are based on the available made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity surveyor appointed by Developer Engineer. the assumption to the cost of material. labour and other inputs mad by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 16,50,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of Project is with references to the Civil, MUP and Alied works required for completion of the apartments and Proportionate complication of internal external works. As per specifications mentioned in agreement of sale and For the purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) r Layout / Plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. APRA PA Shripad Deshmukh and Associates, B-302, Space Olympia, Sutgirni Chowk, Garkheda, Chh. Sambhajinagar 431009 Contact: +919923410057 or Mail- deshmukhsg30@gmail.com SHRIPAD DESHMUKH AND ENGINEER'S AND cONSULTANT ASSOCIATES 4. The Table A Estimated Cost and B) the Incurred till date is calculated at Rs. 5,25,93,130/- (Total of amount of Estimated Cost incurred is calculated on the nput materials/services used and unit cost of this basis of items. 5. The Balance Cost of of the Apartments and Completion of the Civil, MEP and Allied works for completion mentioned in agreement Completion of internal & external works, as per specifications (Total of Table A and B) of sale. of the Proiect is estimated at Rs. 11,24,06,870/ O.Tcertity that the Cost of the Civil. MEP and proportionate and internal & Extremal works, allied work for the apartments and as per specifications mentioned in agreement ofsale, of the aforesaid Project as completed on is as given in (Table A and B) the date others certificate below: TABLE-A-1 Building A Commercial Wing at bearina Number Gut No. 22, Shanoorwadi, Cha Sambhajinagar, called "ABK Aurix" Sr.no Particulars Amount (in Rs.) Total estimated Cost of the Building/Wing /Layout / 6,00,00,000 Plotted Development as on date of Registration is 2 Cost increed as on date of certificate 4,34,76,450 Work done in Percentage (as Percentage of the 72.46% estimated cost) 4 Balance Cost to be incurred** (Based on Estimated 1,65,23,550 Cost) 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-A-2 Building B1-B2 Residential Wingat bearing Number Gut No. 22, Shanoorwadi. Cha Sambhajinagar, called "ABK Aurix " Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building Wing/Layout| 4,25,00,000 Plotted Development as on date of Registration is 2 Cost increed as on date of certificate 45,87,340 Work done in Percentage (as Percentage of the 10.79% estimated cost) 4 Balance Cost to be incurred ** (Based on Estimated 3,79,12,660 Cost) 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) Shripad Deshmukh and Associates, B-302, Space Olympia, Sutgirni Chowk, Garkheda, Ch Sambhajinagar 431009 Contact: +91 9923410057 or Mail- deshmukhsg30@gmail.com SHRIPADDESHMUKH AND ASSOCIATES ENGINEER'S AND CONSULTANT TABLE-A-3 Building C1-02 Residential Wing at bearing Number Gut No. 22, Shanoorwadi, Cha Sambhajinagar, called "ABK Aurix " Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building Wing / Layout / 4,25,00,000 Plotted Development as on date of Registration is 2 Cost increed as on date of certificate 3 Work done in Percentage (as Percentage of the 0% estimated cost) 4 Balance Cost to be incCurred** (Based on Estimated 4,25,00,000 Cost) 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Sr Particulars Amount (in Rs.) No Total Estimated Cost of the lnternal and External 2,00,00,000 Development Works including amenities and Facilities in Cost incurred as on date of certificate 45,29,340 Work done in Percentage (as Percentage of the 22.65% estimated cost) Balance Cost to be incurred** (Based on Estimated 1,54,70,660 Cost) 5 Cost Incurred on Additional /Extra items not included inthe Estimated Cost (Table -C) Yours Faithfully, Agreedand Accepted by: GALAP Engineer Shripad Deshmukh Signature of Promoter Name: Gopal Balaprasad Ajmera G9PAL DCE Civil Engineer Date: 07/07/2026 Date: 07/07/2026 Shripad Deshmukh and Associates, B-302, Space Olympia, Sutgirni Chowk, Garkheda, Chh. Sambhajinagar 431009 Contact: +919923410057 or Mail- deshmukhsg30@gmail.com SHRIPAD DESHMUKH ENGINEER'S AND CONSULTANT AND Note: ASSOCIATES 1 The sCope of work is to complete approved from time to time and as Registered Real Estate Project as per specifications per drawings 2. ) Quantity survey mentioned in agreement of sale. can be done by office independent Quantity Surveyor. whose of Enaineer or can be done by an upon by the Engineer. In case certificate of quantity calculated can of Developer,the name has to be independent guantity surveyor being appointed be relied are being calculated by mentioned at the by office of Engineer, the place marked (") and in case quantity Engineer, who is responsible for the name of the place marked (") quantity calculated shouldperson in the office Or be mentioned at the 3. (**) Balance Cost to be estimated Cost (1) and Actualincurred (4) may vary from Difference Cost incurred (2) due to deviation between Total escalation of cOst etc. As this an estimated in quantity required for development of the Real cost, any deviation in quantity Estate Project will result in amendment of therequired incurred to be incurred. cost 5. All components of work with specifications are indicative and not exhaustive 6. Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted ltems considered in (which were not part of the original Estimate of Total Cost Cost) Sr.no Particulars Amount (In Rs.) 2 Shripad Deshmukh and Associates, B-302, Space Olympia, Sutgirni Chowk, Garkheda, Chh. Sambhajinagar 431009 Contact: +91 9923410057 or Mail- deshmukhsg30@gmail.com