_--..--- I I qa Amol Kshirsagar Architectural Planner, Consulting Engineer & Valuer Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawar of Money from Designated Account) To, Oate:1910112025 M/s Sara lnfrastructure, Office No.D-55, 1st Floor, Gajanan Vaibhav Complex, Cannught Place, Aurangabad. Subject: 9:,1i!9.1" .of Percentago of Comptetion of Construction Work of SARA SWARAJYA PHAsE-r havins MahaREM Registrarion psrloooiisza u"ing our"ioplJ ov Sara lnfrastructure. (Oct to Dec 2024) ^tumoer Sir, l/ we Amol Kashirsagar have _undertaken assignment as Arc[r99!_{ Lrcensed Surveyor of Percentage of compretion of consrruction -ilirneRA certifying. w"it snnn-swinnlvn Registration Number p51500077523 being DevelopeO iin-se-_r--i,"i,1,ig Oy S"r" tn*r.tru.trru Based on the sjte lnspection, with respect to-the Layout / each Building^/ving of the aforosaid Reat Estate 'fi,"-ierlentage _certify tha't as on date_ oi this curtin*-t", ProJe-ct, -1. BuildingMing- of the Real Estate Project unoer rraanahiin of work Done for each of the iJ J. p"r Tabte-A1 to A5 herein betow. The percentage of work executed with resfect to each of the activity of intire phase ir o"i.il"J i. iroi"-a. ,TABLE.A-1 SARA AP RAIGAO A TYPE BUILDING Percentage of Actual Work Done (As on date of the X number of Baseme.ntlsy qnd pl1.th lnternal walls, @ Flats/Premises, Doors and Windows to eaih of the Fittings within tne FtaVpEmEEs, , Lifts Wetls ano Lobbiei at EaiE' level Staircases and Lifts, Overhead and Flat No.4, Plot No. 102, Nathprangan,Garkheda, Chhatrapati Sambhajinagar Mob. : 09960669921 I The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Buildino/lvinq 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/}Ving, Compound Wall and all other requirements as may be required to Obtain Occuoation /Comoletion Certificate TABLE-A.2 Building SARA SWARAJYA PHASE-I RAJGAD B ryPE BUILDING S. No. Tasks / Actlvlty Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 100 X number of Slabs of Super Structure 50 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary. Fittings within the FlauPremises, Electrical 0 Fittinos within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Buildino/}Vino 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical flttings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglVVing, Compound Wall and all other requirements as may be required to Obtain Occuoation /ComDletion Certificate TABLE.A-3 Buildlng SARA SWARAJYA PHASE-I VISHALGAD C TYPE BUILDING S. No. Tasks / Actlvlty Percentage of Actual Work Done (As on date of the Certlflcate) (1) (21 (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. 9 The external plumbing and enernal plaster, elevation, 0 completion of terraces with waterproofing of the Buildino/VVino 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all 6ther requirements as may be required to Obtain Occupation /Completion Certiflcate 'TABLE-A.4 Building SARA SWARAJYA PHASE-I PRATAPGAD C TYPE BUILDING S. No. Tasks / Activity Percentage of Actual Work Done (As on date of th€ Certlflcatel (1) (21 (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 100 X number of Slabs of SuDer Structure 30 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittinqs within the FlauPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterprooflng of the Buildino/lvinq 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain OccuDation /Completion Certifi cate TABLE.A.5 Bullding SARA SWARAJYA PHASE-I SINHAGAD C wPE BUILDING S. No. Tasks / Actlvity Perc6ntage of Actual Work Done (As on dat€ of the Certlflcate) (1) (21 (3) I Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 100 X number of Slabs of Super Structure 35 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Flremises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. I The eliternal plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Buildinq/vVinq 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical flttings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRz NOC, linishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingruVing, Compound Wall and all other requirements as may be required to Obtain Occuoation /Completion Certificate TABLE.B common Areas (lnternal & External Development works) in respect ofthe Registered phase s. Common Areas & Facllities Proposed Percentage Details No. (Yes / NO) of actual Work Done (As on date of Certlficate) (1) (2) (3) (4) (s) 1 lnternal Roads & Footpaths YES lnternal Project Cement Roads 2. Water Supply YES 20% 3. Sewerage (Chamber, Lines, YES 00 Drainage Line Septic Tank, STP) 4. Strom Water Drains NO NA Landscaping & Tree Planting Yes 00 Tree Plantation and Garden 6. Street Lighting Yes 00 Street Lights for lnternal Proiect 7. Community Buildinos No 8. Treatment & Disposal of YES 00 SEPTIK TANK Sewaqe and Sullaqe Water 9. Solid Waste Management & No Disposal 10. Water Conservation / Rain Yes 00 Rain Water Water Harvesting Harvesting as per Norms 't1. Enerqy Management 12. Fire Prdtection & Fire Safety NO NA NA requirements 13. Electrical Meter Room, Sub- No NA Station, Receivinq Station Yours faithfully, Srgnature & Name Er. Amol License Number Agreed & Accepted by: $(d$-. Signature of Pror$ofer Name: Sara lnfrastructures Dale: 1910112025