s = , Amol Kshirsagar Architectural Planner, Consulting Engineer & Valuer Ann6xure - B FORM - 2 lsee Regulatlon 3I ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date: 1910112025 To, M/s Sara lnfrastructures, Oftice No.D-55, 1st Floor,Gajanan Vaibhav Complex, Cannught Place, Aurangabad. Subject: Certificate of Cost lncuned for Development of SARA SWAMJYA PHASE-I having MahaRERA Registration Number P51500077523 being Developed by Sara lnfrastructure. Sir, I Er. Amol Kshlrsagar have undertaken assignment of Certifying Estimated Cost for SARA SWAMJYA PHASE-I having MahaREM Registration Number P51500077523 being Developed by Sara lnfrastructure. (Oct to Dec 20241 1. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Er. Amol Kshlrsagar Quantity Surveyor. appointed by the Developer/Engineer, the assumption ofthe cost of material, labour & other inputs made by the Developer, and the Site lnspection canied out by us to ascertain / confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 31,72,97,120/- (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & extemal works, as per the specifications mentioned in the of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for Building(s) / Wing(s) / Layout / Plotted Development from the AMRDA, Chhatrapatl nagar being the Planning Authority under whose jurisdiction the aforesaid Project is being o. The Estimated Cost incurred till date is calculates to Rs. 7,65,94,842l- (Total of Table A & B). of .EF.timeled.-c..o..s!.lncuned.!s..-c.d.suhlpd .o..('..th.e..-b.?.gis.qf-inp.u.l.m.al-e.rials./.seryic--es items. Flat No.4, Plot No. 102, Nathprangan,Garkheda, Chhatrapati Sambhajinagar Mob. : 09960669921 / I r' 4. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifiGtions mentioned in Agreement of Sale, of the aforesaid Project is estimated al Rs. 24,07,02,278/- (Total of Table A & B). 5. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & e)dernal works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building'ss "Sara SWARAJYA PHASE-I of the Real Estate S. Particulars Amount (ln Rs.) No. 1 Total Estimated Cost of Building / Wing / Layout / 2900027 Mt- Plotted Development as on date of Reqistration is 2. Cost incurred as on date of Certificate Oec 2024 72500686/- Work Done in Percentage (as Percentage of Estimated 25% Cost) 4. Balance Cost to be incurred ** (based on Estimated 2',17 502058t - Cost) R Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) TABLE - B lnternal & External Works in of Phase S. Particulars Amount (in No. Rs.) 1. Total Estimated Cost of lnternal & External 2,72,94,3761- Development Works rncluding amenities & facilities in the Lavout as on date of Reqistration is 2. Cost incurred as on date of Certificate Till Dec 40,94,'t56/- 2024 J. Work Done in Percantage (as Percentage of 15% Estimated Cost) Apolied for ComDletion... 4. Balance Cost to be incured -. ((based on 2,32,00,220- Estimated Cost) Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Yours faithfully, Er Amol Kshirsagar Agreed & {pcept\d by: a'nnr,rr"ffi*'", Name: Sara lnfrastructures Date: 1910112025 Note: 1 . The scope ofwork is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ('). 3. C.) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred to be incuned. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) s. List of Extra / Additlonal Amount (in Rs.) No. / Deleted ltems I 2.