s , Amol Kshirsagar Aanexure - B Architectural Planner, Consulting Engineer & FORM - 2 Valuer [See Regulatton 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of . Money from Designated Bank Account) Dale 13-07 -2024 To, SARA INFRASTRUCTURES, OFFICE No. 1 to 9, FIRST FLOOR, NARAYAN PLAZA, CANNAUGHT PLACE, CIDCO, CHHATRAPATI SAMBHAJINAGAR Subject: Certificate of Cost lncurred for Development of SARA SWARAJYA pHASE-l having MahaRERA Registration Number NEW PROJECT being developed by SARA INFRASTRUCTURES 1. | / We ER AMOL KSHIRSAGAR have undertaken assignment of Certifying Estimated Cost for SARA SWARAJYA PHASE{ having MahaRERA Registration Number NEW PROJECT being developed by SARA INFRASTRUCTURES. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made avaitable to us for the project under Reference by the Developers / consultants. The schedule of ltems & euantity required for the entire work as calculated by Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. we estimate Total Estimated cost of completion of the aforesaid project mentioned reference at Rs. 31,72,97,1204 (Total of Table A & B) at the time of Registration. estimated Total Cost of Project is with reference to the Civil, MEp & Allied Works pletion of the apartments & proportionate comptetion of internal & external works, as per specifications mentioned in the Agreement of Sale & for the purpose of obtaining tion Certificate / Completion Certificate for the Building(s) / Wing(s) I Layoul I Plotted pment from the CIDCO CITY AND INDUSTRTAL DEVELOPMENT - CORPO JION OF MAHAMSHTRA LIMITED being the planning Authority under on the aforesaid Project is bei Flat No.4, Plot No. 102, ,h\'' Nathprangan,Garkheda, Chhatrapati Sambhajinagar Mob. : 09960669921 4' The Estimated cost incurred tifl date is carcurates to Rs. Nru- (Totar of rabre A & B). The Amount or Es.tima.ted.-ep..* lnpur.ed.r.q. -c.ar.s,uta.ted. o-n.r.h.e.p..?.srs..sf.inp.u.t.m.a.teriati.i .qe.ryice.s..us.e.d &..v,nit.g._o.-s.t_cf .the..qe_!l_e_.m.9. ^ The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid project is estimated at Rs. 31 ,72,97 ,120 (Totat of Tabte A & B). 6 l certify that the cost of civir, MEp & AIied work for apartments & proportionate internar & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as compreted on the date of this certificate is as given in Tabre A & B below: TABLE - A Building / wing / Layout / protted Deveropment FoR SARA swARAJyA PHASE-I - A.WPE RAIGAD BUILLDING, B.TYPE RAJGAD BUILDING, G-TYPE SINHGAD BUILDING, C.ryPE PRATAPGAD BUILDING, C-WPE VISHALGAD Totat Estimatedc@ Rs.29,0O,02,744 Plotted Development as on date of Re;istraiion is Cost incurred as on dat,e of Certificate WorkDone-in@ Estimated Cost) Balance Cost to be irrcuEd * (biGd on Rs. 29,0O,O2,744t- Estimated Cost) Cost incurred on AOOitional lExE lterns not included in the Estimated Cost (Table-C TABLE ,t"Te & External Development Works -FOR SARA SWARAJYA pHASE_t A- B _ TYPE RAIGAD BUILLDING, B-TYPE RAJGAD BUILDING, C.TYPE SINHGAD BUILDING, C-TYPE PRATAPGAD BUILDING, C.ryPE VISHALGAD BUILDING s. particulars Amount (in Rs.1 No. 1. Development Works including amenities & facilities Rs27rp4,3?6/-- il the Layout as on date of Regishation is 2. Qost incurred as on dat,e ofEEijfic-ate Rs. NIU- J^. worl( uone in percentage 1as percentage oi- 0% Estimated Cost) 4. oatance uosl Io De tncurred ** ((based on Rs.2,72,94,376t- Estimated Cost) A vusr tncLlrreo on Aootttonal / Extra ltems not included in the Estimated Cost (Tabte_C) Yours faithfully, ER AMOL KSHIRSAGAR Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number E t fi4 t g3 Agreed & Accepted by: fl% Signature of Name: SARA $*# Dale: 1 3-Ol -2024 Note: l The scope of work is to.comprete Registered Rear Estate project as per from time to time as per s[ecincation-J drawinos S:lJ** mentioned in the Agreement io 2. (t). euantity Survey can be done by the office of En