I Amol Annexure A Kshirsagar Architectural Planner, FORM 1 Consulting Engineer & [See Regulation 3] Valuer ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawa-1 of Money from Designated Account) Dale:13-07-2O24 To, SARA INFRASTRUGTURES, OFFICE No. 1 to 9, FIRST FLOOR, NARAYAN PLMA, CANNAUGHT PLACE, CIDCO, CHHATRAPATI SAMBHAJINAGAR Subject: Certificate of Percentage of Completion of Construction Work of SARA SWARAJYA PHASE-I having MahaRERA Registration Number NEW PROJECT being developed by SARA INFRASTRUCTURES. Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying percentage of completion of conskuction work of SARA swARAJyl Funsel niviig ManaREnn Registration Number NEW PROJECT being devetoped by SARA trufnASfRUCiUReS. Based on the site lnspection, with respect to the Layout / each BuildingAruing of the aforesaid Real EstateProject, I certify that as on date of this certificate, the perceitage-of work Done for each of the BuildingMing of the Real Estate project under MahaREM is aJ per Table-A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number OF SARA SWARAJYA pHASE-t A.WPE RAIGAD BUILLDING - F. Tasks / Activity Percentage of Actual Worli *\ Done (As on date of the Certificate) (1) (21 t3) 1 \Excavation 0% 2 X number of Basement(s) and Plinth Oo/o 3 X\umber of Podiums 0% 4 Stilt\Floor ' 0o/o 5 X nuhber of Slabs of Super Structure 0% 6 walls, lnternal Plaster, Flooringrs rvithin 0% ises, Doors and Windows to each of the 7 Sanitary Fitti\gs within tne f taUpremises, etectricat 0o/o Fittings within\e FlaUPremises r.4, Plot No. 102, Flat No.4, Nathprangan,Garkheda, Chhatrapati Sambhajinagar Mob. : 09961 09960669921 S6lE Staircases,L@ connecting Staircases and Lifts, Overhead and Underground Water Tanks. Theexternalplumo@ completion of terraces with waterproofing oi the lnstallation otlifts,@ as.per CFO NOC, Etectricat fittings'io ll:-trCurpment Common Areas, elecko, mechanicd '- uomptrance to conditions of environment"d,p;;;i,"- /CRZ NOC, Finishing to entrance lobby/s, plinth protection. o"ri-nt ot areas appurtenant to BuildingMing, Compound Wlll and all other requirements as may OjiequireO io Obtain Occupation /Completion iertifi catre TABLE-A Layout / Building / Wing Number OF SARA SWARAJYA pHASE_t _ B-TYPE RAJGAD BUILLDING Percentage oiactuat Wo* Done (As on date of the Excavation X number of B?se6Eit(s)aid-ptinth X number of Podiunrs Stilt Floor X number of Slabs of Super Structure lnternatwalls@ Flats/Premises, Doors and Windows t5 eactr ot tne FlaUPremises SanitaryFittingswit@ Fittings within the Flaupremises Staircases,L@ connecting Staircases and Lifts, Overhead and Underground Water Tanks. Theextematp@ completion of terraces with waterproofing of the lnstatlation of lifts@ as.per CFO NOC, Etectricat Rttingsio Common Areas, electro, mechanicd eq;,p;;;i, "- '- 11l-Equrpment Compliance to conditions of environment iCnl f.rOC, Finishing to entrance lobby/s, plinth protection. oavi-no oI areas appurtenant to BuildingMing, Compound Will and all other requirements as may bjrequireO io Obtain Occupation /Completion iertificatre -\ir-\. ir.{o \'l ,7{rt \; rcln. ,2) Yd v TABLE.A Layout / Building / Wing Number OF SARA SWARAJYA pHASE-l _ C-TYPE SINHGAD BUILLDING S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the (1 (2 _ Gertificate) (3) 1 Excavation 100o/o 2 X number of Basement(s) and plinth 100yo X number of Podiums NA 4 Stilt Floor NA 5 X number of Slabs of Super gtructure 1) EO/- b lnternal walls, lnlernal Plaster, FlooringLs witnin Oo/o Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the f laUpremises, Electrical Fittings within the FlaUPremises 8 Staircases, Litts Wetts anO LobOiEs at eacn f toor tevet 0o/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external ptumoing@ 0o/o completion of terraces with waterproofing of the BuildingAffing 10 lnstallation of lifts, water pumps, fire f ighting Fittings 0% and Equipment as per CFO NOC, Electiical Rttings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA/Ving, Compound Will and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Layout / Building / Wing Number OF SARA SWARAJYA pHASE-t _ C-TYPE PRATAPGAD BUILLDING S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0% 2 X number of Basement(s) and plinth 0o/o X number of Podiumi 0% 4 Stilt Floor 0o/o X number of Slabs of Super Structure 0% b lnternal walls, lnternal Plaster, ftoorings wittrh OYo Flats/Premises, Doors and Windows to each of the FlaVPremises SanitaryFjtt@ Fittings within the FlaUpremises staircases@ connecting Staircases and Lifts, Overhead -'-' "na- Theexterna@ - " -' " g?.Tf l"lfl, "l brraces wirh waterproofi ns oi in"' fr.1;[,fiTm ::ITgn Ar:as uomprrance erect'.o, mecnan tI; to conditions of -";;ifi environment )CRZ NOC Finishing to entrance toOUyls, ptinin proG;il;. ;;i:r" - oT areas appurtenant to Building/Wing, ;;;; Compouna Will and all other requirements as may bjrequired uoratn Uccupation /Completion Certificatre io .Layout / TABLE-A Buitding / Wing Number OF SARA SWARAJYA pHASE-t _ C-TYPE VISHAL BUILLDING Percentage o-ilctual Work Done (As on date of the Excavation X number of Basenrent(s) and plinth X number of podiumi Stilt Floor X number of Stabiif S Structure rnternal walls@ Flats/Premises, Doors and Windows tJ eactr ot tire Sanitaryrittin@ [!!4gqry!l!n the FlaUpremises Staircases,-Lift@ connecting Staircases and Lifts, Overheal -'-' Underground Water Tanks. "na- The_externalp@ comptellon of terraces with waterproofing of the lnstaltationoffi :i::1TT:ll cFo Noc. Etectiicat ittingsio etectro, r".h.;;;i;;;,p;;i, "'" Areas,"s,per 9:TT9" Lompttance to conditions of environment /CRZ NOC. Finishing to entrance lobby/s, plinth prlt".ti"". or areas appurtenant to BuildingA/Ving, ""-ri"t CompounO Witt and all other requirements as may OJiequireJ Obtain Occupation /Completion iertificate io ryk TABLE-B !9,199n {eas (lnternar & Externar Deveropment works) oF sARA swARAJyA pHASE-r - A- TYPE RAIGAD BU]LLDING, B^-IIP-E.B!94O EUILOIi.IC, C-WPE SIruHCAO EUTLiINC, C- TYPE PRATAPGAD BU LDI C-TYPE VISHALGAD BIIII DING S. Common Areas & Facilities Proposed Percentage Details No. (Yes / NO) of actual Work Done (As on date of Certificate) (1) (21 (3) (41 (5) 1. lnternal Roads & Footpaths YES 0% INTERNAL PROJECT CFMtrNT r)Q TAP P^AN 2. Water Supply YES 10o/o FROM BORE-WELL J. Sewerage (Cnamber, Lines, NO N. A. Septic Tank, STP) 4. Strom Water Drains NO t N. A. Landscaping & Tree Plantr'ng YES o% INTERNAL PROJECT TREE PLANTATION b. Street Lighting YES 0% INTERNAL PROJECT STREE LIGHTING 7. Community Buildingg NO N. A. 8. Treatment & Disposal of Sewage NO N. A. and Sullage Water 9. Solid Waste Management & NO N. A. Disposal 10. Water Conservation / Rain Water YES 0% RAIN WATER Harvesting HARVESTING AS PER NORMS 11. Energy Management NO N. A. 12. Fire Protection & Fire Safety YES 0% AS PER FIRE NORIVS requirements 13. Electrical Meter Room, Sub- YtrS o% AS PER MSEB NORMS Station, Receiving Station 14. Others (Option to Add morcF^....- NO N. A. Yours f.rithfully, /i Ih,,)\a- AMOL 1(SHIRSAGAR @ fl Signatur'e.& Name (tN BLOCK LEerffiffi License Number t____ --:: b,4 ,N{;" Y Agreed & Accepted byl Signature of Proh'iol NAMC: SARA INFRASTRUCTURES Dale: 13-O7 -2024