ET SYED SHOEB AHEMAD COLONIY, JINSI, AURANGABAD Annoxure - B FORIU - 2 [See Regutratton 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Desig-nated Bank Account) Date: 18-10-2024 To, SUNRISE CONSTRUCTIONS' BLOCK NO 3 AND 4, GLOBAL AVENUE' BESIDE MUNICIPAL CORPORATION MARKET' PAITHAN GATE AREA, AURANGABAD Subject:CertificateofCostlncurredforDevelopmentofSUNRISEELITEhavingMahaRERA Registration Number P51500055264 being developed by SUNRISE CONSTRUCTIONS. (For Jul to Sep 2024 QTR) Sir. t. I / We Er SYED SHOEB AHEMAD have undertaken assignment of certirying Estimated cost for suNRISE ELITE having MahaRERA Registration Number P51500055264 being developed by SUNRISE CONSTRUCTIONS. we have estimated the cost of civil, MEP and Allied works required for completion of the per the apartments & proportionate completion of internal & extemal works of the Project as on specifications mentioned in the Ageement of Sale. Our estimated cost calculations are based the Drawings/Plans made available to us for the Project under Reference by the Developers / consultants. The Schedule of ltems & Quantity required for the entire work as calculated by assumption ofthe cost of material' Quantity Suveyorr appointed by the Developer,/Engineer, the labour & other inputs made by the Developer, and the Site Inspection caried out by us to ascertain / confirm the above analysis given to us J. we estimate Total Estimated cost of completion of the aforesaid Project mentioned under reference at Rs. 18,52,09,200/- (Total ofTable A& B) at the time of Regishation. The estimated Total cost of Project is with reference to the civil, MEP & Allied works completion of the apartments & proPortionate completion of internal & extemal works, as per the speciftcations / mentioned in the Agreement of Sale & for the purpose of obtaining occupation certificate completion certificate for the Building(s) / wing(s) I Layo* lPlotted Development from the AURANGABADMUNICIPALCoRPoRATIoNAURANGABADbeingthePlanning Authority under whose jurisdiction the aforesaid Project is being implemented' ET SYED SHOEB AHEMAD 4. The Estimated Cost incurred till date is calculates to Rs. 3,70,41,8401 (Total of Table A& B)' The Amount of Estim4led.,eq$ Itqur.r,ad i!.qalc.,ulafed qn.lhe b4si.s.-sf ,ilput matc-ria,ls I s.ervic,e,s qse.d. & ur1!! eqs! qllhese.iteqls. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of intemal & external works, as per specifications mentioned in Agreement ofSale, ofthe aforesaid Project is estimated at Rs. 14,81,67,360/- (Total ofTable A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate intemal & external works, as per the specifications mentioned in Agreement ofSale, ofthe aforesaid Project as completed on the date ofthis certificate is as given in Table A & B below: TABLE - A Building / Wing / Layout / Plotted Development FOR SUNRISE FI,ITE S. No. Particulars Amount (in Rs.) I Total Estimated Cost of Building / Wing I Layo\t / Rs.17,02,42,800/- Plotted Development as on date of Registration is 2. Cost incured as on date ofCertificate Rs.3,40,48,5601 30 September 2024 _). Work Done in Percentage (as Percentage of Estimated 20% Cost) 4. Balance Cost to be incuned +t ((based on Estimated Rs.13,61,94,240l- Cost) 5. Cost incurred on Additional / Extra ltems not included in the Estimated Cost lTable-C) , TABLE - B lntemal & Extemal Development Works FOR SUNRISE ELITE S. No. Particulars Amount (in Rs.) I Total Estimated Cost of Internal & Extemal Rs.l,49,66,400/- Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date ofCertificate Rs.29,93,280/- 30 September 2024 J. Work Done in Percentage (as Percentage of Estimated 20% Cost) 4. Balance Cost to be incurred +' ((based on Estimated Rs.1,19,73,120/- Cost) 5. Cost incurred on Additional / Extra Items not included in the Estimated Cost lTable-C) ET SYED SHOEB AHEMAD Yours faithfully, ET SYED SHOEB AHEMAD Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer I-ocal Authority License Number (if applicable) Agreed & Accepted by: suNRlsE 9ONSTnucTloil PARTNEP'r Signature of Promoter Nanre: SUNRISE CONSTRUCTIONS Date: 18-10-2024 Note: l. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office ofEngineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity 'Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (t) & in case quantity are being calculated by offrce of Engineer, the name of person in the oflice of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (t). 3. (**) Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (l) & actual Cost incurred (2) due to deviation in quantity required / escalation ofcost etc. As this is an Estimated Cost any deviation quantity required for the Development ofReal Estate Project will result in an amendment ofthe cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhauslive 5. Please speci$ if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale' ET SYED SHOEB AHEMAD H NO 4-4-5r, QAESAR COLOi{Y, IINSI, AURANGABAD TABLE-C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts ofthe original Estimate ofTotal Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) I