IMPACT DESIGN & ASSOCIATES BLOCK NO 3, GLOBAL AVENUE COMPLEX, BESIDE AMC MARKET, PAITHAN GATE, AURANGABAD Annexure A FORM I ISee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Datei 12-07-2024 To, SUNRISE CONSTRUCTIONS, BLOCK NO 3 AND 4, GLOBAL AVENUE, BESIDE MUNICIPAL CORPORATION MARKET, PAITHAN GATE AREA, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SUNRISE ELITE having MahaRERA Registration Number P5,l500055264 being developed by SUNRISE C0NSTRUCTI0NS. (For Apr to Jun 2024 QTR) Sir, I / We IMPACT DESIGN & ASSoCIATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SUNRISE ELITE having [/ahaRERA Registratron Number P51500055264 being developed by SUNRISE C0NSTRUCTI0NS. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingArVing of the Real Estate Project under MahaREM is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A Layout / Building / Wing Number for Sunrise Elite s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 0% 5 X number of Slabs of Super Structure o% o lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises IMPACT DESIGN & ASSOCIATES BLOCK NO 3, GTOBAL AVENUE COMPIEX, BESIDE AMC MARKET, PAITHAN GATE, AURANGABAD 7 Sanitary Fittings within the FlaVpremises, electrical 0% Fittings within the FlavPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing anA extern-at plaster, etevation, Oo/o completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps, Fire f ighting Fittings 00 and Equipment as per CFO NOC, Electrical iittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAr'/ing, Compound Will and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-B Common Areas (lnternal & External Development Works) for Sunrise Elite S. No. Common Areas & Facilities Proposed Percentage of Details (Yes / N0) actual Work Done (As on date of Gertificate) (1) (2t (3) (4) (s) 1 lnternal Roads & Footpaths : No NA 2. Water Conservation, Rain water Yes 0% Rain Water Harvesting Harvesting: As Per Norms Energy management : No NA 4. Fire Protection And Fire Safety Yes Oo/o As Per Norms Requirements: Electrical Meter Room, Sub- Yes 0% As Per MSEB Norms Statron, Receivinq Station : 6, Aggregate area of recreational No NA Open Space : 7. Open Parking : Yes 0% As Per Drawing 8. Water Supply : Yes 10% From Bore-Well 9. Sewerage (Chamber, Lines, Yes o% Drainage Line Till Septic Tank , STP) : Corporation Line 10. Storm Water Drains : No NA 11 Landscaping & Tree Plantinq : No NA 12. Street Lighting : No NA 11 Community Buildings : No NA 14. others (option to Add more) No NA IMPACT DESIGN & ASSOCIATES BLOCK NO 3, GLOBAL AVENUE COMPLEX, BESIDE AMC MARKET, PAITHAN GATE, AURANGABAD Yours faithfully, For IMPACT DESIGN & ASS0CIATES, SIDDIQUI M. l-iAt'il; i. 66-; ARCH. HARES SIODIQUI B.ARCH, M,C.A. Block No.3, GlobalAvenue ComPlex BesideAMC Market, Paithan Gate, Aurangabad. Reg No. Ctu2003/30793 Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number CA / 2003 / 30793 Agreed & Accepted by: SUNRISE CONSTRUCIION Signature of Promoter Name: SUNRISE C0NSTRUCTI0NS Date: 12-07 -2024