ZAINUL ABEDEEN SHAII(H EVIGEN GLOBAL PVT LTD 811-12. PROZONE TRADE CENTRE, AURANGABAD Annexure C FORM - 2A {See MahaRERA Order No. 5 of 20 18) trNGINDER'S CtrRTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) . (To be submitted at the end of Financial Year) Dale: 10-04-2024 To, SUNRISE CONSTRUCTIONS, BLOCK NO 3 AND 4, GLOBAL AVENUE, BESIDE MUNICIPAL CORPORATION MARKET, PAITHAN GATE AREA, AURANGABAD QUALITY ASSURANCE CERTIT'ICATE (Ccrtificate No for the Year Ending 2023 24) Sublect: Certificate for quality materials used and quality of Construction & workmanshrp for the work of SUNRISE ELITE having MahaRERA Registration Number P51500055264 being developed by SUNRISE CONSTRUCTIONS Sir, | / We Er ZAINUL ABEDEEN SHAIKH have undertaken an assignment of supervision of this Real Estate Project OUR RESPONSIBILITY l/ We are responsrble for carrying out the work in accordance with that with development permtssron and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. t1] INPUT MATERIALS, FIXTURES & FITTINGS | / We hereby certify that all Construction material. Fixtures and Fittings with regard to the flooring. Electrical, Sanitary Fittings. etc and amenities to be provided by the Promoter in the sard prolect. bu lding and the Apartment as are as per specifications mentioned in Annexure'E, of Agreement to Sale ZAINUL ABEDEEN SHAII(H EVIGEN GLOBAL PVT LTD 811-12, PROZONE TRADE CENTRE, AURANGABAD For those items, where no specification have been mentioned in Agreement of sale. the Materials, Fixtures and Fittings used conform to the relevant Bls standard / ls / National Building Codes or as per lndustry Standards. 121 WORKMANSHIP I / We hereby certify that the work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviation as per relevant code of practice. t3l STRUCTURALENGTNEER Promoters have engaged structural engineer M/s. ICON CONSULTANTS having License No having Office at NEAR SIYA MEDICAL, AZAD CHOWK, AU RAN GABAD. The structural design of buildings in this Project has been done under his supervision. The formwork and concrete mix design has been done as per ls 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for srABlLlry and SAFETY have been kept on record Isl PRESERVATION OF RECORDS Record of all test results of this Project have been properly kept in the prescribed format'and will be preserved at least up to the Defect Liability Period or for the period as required by any other provision of Law Please specify deviation in quality of materials or any other item of work which were not conforming to the spectfications as mentioned in Agreement of Sale. Yours faithfully. (ovll) 'lhde C€ntre Signature of Engineer (Site Supervrsor) Name: Er ZAINUL ABEDEEN SHAIKH License No (rf any): Mobile Nor 9028516175 SUNRTSE CONSTRUCTION Place: AURANGABAD Agreed & Accepteq by: PARTNEfI Signature bf Promoter Name SUNRISE CONSTRUCTIONS Dale 10-04-2024