Architects lnterior Designers Project Consultants Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 15/05/2025 To, M/S KRPS Properties, 2nd Floor, RK Tower, Shivaji Nagar Road, Beside Water Tank, Chh. Sambhajinagar,43l 005 Subject: Certificate of Cost lncurred for Development of Adinath Aangan Phase-01 situated at Gut No. 9S/P, Deolai, Ghh. Sambhajinagar. having MahaRERA RegistrationNumber P51SOOOI7736 being devetoped by M/S KRPS Properties Sir, lA/Ve Er. Milind Wadekar have of Certifying Estimated Cost for Adinath Aangan Phase-oi situated at Gut No. 95/P, Deolai, Chh. Sambhajinagar. having MahaRERA Registration Number (P51500027736, being devetoped by M/S KRPS Properties ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project underreference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate the Cost of the aforesaid project under reference as Rs. 9,45,52,000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /VVing(s)/ Layout /Plotted Development from the Town ptanning Municipal Corporation Chhatrapati Sambhajinagar being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4.The Estimated Cost incurred till date is calculated at Rs.1,91,71,000.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. tlishigandh-C, Disha Srushti, Opp. Hotel Atithi, RananagaI Jalna Rd, Chh Maharashtra - 431005 q +91 240 2451615)K info@samilarchitects.com 1 Total Estimated Cost of the BuildingAl/ing/Layout 1 ,40,85, 000.00 Plotted Development as on date of Registration (19/09/2024) is 2 Cost incurred as on date of certificate 00.00 3 Work done in Percentage (as percentage of the estimated cost) 0.00% 4 Balance Cost to be lncurred**(Based on Estimated Cost) 1,40,85,000.00 5 Cost lncurred on the Additional/Extra items not included in the 00.0( Estimated Cost (Tablc -C) Overal! Project Completion is 20.30 % & 0.00 % for internal & external devetopment work. Yours Faithfully Er. MILIND WADEKAR Signature & Name (lN BLOCK LETTERS)with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. MCB/R/20191 APLI0O260 (if appticabte) Date of Certiflcate: Agreed and Accepted by: Signature of Promoter Name: M/S. KRPS Properties Date: