Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 19/09/2024 To, M/S KRPS Properties 2nd Floor, RK Tower, Shivaji Nagar Road,Beside Water Tank, Chh. Sambhajinagar,431005 Subject : Certificate of percentage of Work of completion of construction work of Adinath Aangan Phase-01 having MahaRERA Registration Number (Only Applicable after project Registartion) being developed by M/S KRPS Properties Sir, I/We SAMEER AUSEKAR have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Adinath Aangan Phase-01 having MahaRERA Registration Number (Only Applicable after project Registration, being developed by M/S KRPS Properties) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A (APRIL TO JUNE 2024) Layout/Building/Wing Number: BLOCK A R.H. 01 TO R.H. 04 (4 BHK)/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks Page 1 of 3 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: BLOCK B R.H. 05 TO R.H. 08 (4 BHK)/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: APARMENT BUILDING (2/3 BHK)/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) (APRIL TO JUNE- 2024) Sr.No Common areas and facilities Proposed Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 0.00 As per drawings by Consultants 2 Water Supply Yes 0.00 By Borewell 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 0.00 As per drawings by Consultants 4 Storm Water Drains No 5 Landscaping & Tree Planting Yes 0.00 As per drawings by Consultants 6 Street Lighting Yes 0.00 As per drawings by Consultants 7 Community Buildings No 8 Treatment And Disposal Of Sewage And Sullage Water No 9 Solid Waste Management And Disposal No 10 Water conservation /Rain water harvesting Yes 0.00 As per drawings by Consultants 11 Energy managemcnt No 12 Fire protection and fire safety requirements No 13 Electrical meter room, sub-station, receiving station Yes 0.00 As per drawings by Consultants 14 Aggregate area of recreational Open Space Yes 0.00 As per drawings by Consultants 15 Open Parking No 16 Others. Compound wall & Entrance Gate Yes 0.00 As per drawings by Consultants Yours Faithfully SAMEER AUSEKAR Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA-95/19301) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: M/S. KRPS Properties Date: