ARCHITECT'S CERTIFICATE (To Be Submitted At The Time Of Registration Of Ongoing Project And For Withdrawal Of Money From Designated Account-Building/Wing Wise) Date: 25/05/2024. To, Rutuja Developers Shop No. D-4,, Block No. 12, Samyak Arcade, Cannought, Aurangabad, Maharashtra, 431001 Subject : Certificate of Percentage of Completion of Construction Work of 04 No. of Building(s) / N.A Wing(S) of The Only Phase of The (Rutuja Residancy) [Maharera Registration Number] Situated On The (Plot No./Final PlotNo. 01 at Gut No. 138/P Demarcated By Its Boundaries To North Gut no138/P Space To The South 9 mtr road space To The East Gut no138/P To The West Gut no 138/P of Divisions Aurangabad Village Pisadevi TALUKA Aurangabad, District Aurangabad Pin-431007 Admeasuring 6000.00 Sq. Mtr. Area Being Developed By Rutuja Builders and Developers Sir, I Sunil B.Patil Have Undertaken Assignment As Architect / Of Certifying Percentage of Completion of Construction Work of 04 No. of Building(s) / N.A Wing(S) of The Only Phase of The (Rutuja Residancy) [Maharera Registration Number] Situated On The (Plot No./Final PlotNo. 01 at Gut No. 138/P Demarcated By Its Boundaries To North Gut no138/P Space To The South 9 mtr road space To The East Gut no138/P To The West Gut no 138/P of Divisions Aurangabad Village Pisadevi TALUKA Aurangabad, District Aurangabad Pin-431007 Admeasuring 6000.00 Sq. Mtr. Area Being Developed By Rutuja Builders and Developers 1) Following Technical Professionals Are Appointed By Owner / Promoter :- i) M/S. Shri Sunil B.Patil As An Architect: ii) M/S./Shri Abhay S. Patil As Strutural Consultant. iii) M/S./Shri Smt._________________As MEP Consultan iv) M/S. ________________________As Site Supervisor. Based On Site Inspection, With Respect To Each Of The Building/Wing Of The Aforesaid Real Estate Project, I Certify That As On The Date Of This Certificate, The Percentage Of Work Done For Each Of The Building/Wing Of The Real Estate Project As Registered Vide Number [To Be Registered In RERA] - Under RERA Is As Per Table A Herein Below. The Percentage Of The Work Executed With Respect To Each Of The Major Activity Of The Building And Overall Percentage Of Work Done With Respect To Each Building Is Detailed In The Table B. Table-A Building Number 01(Type-A) (To Be Prepared For Each Building /Wing Of The Project) Sr.No. Tasks/Activity Percentage Of Work Done (1) (2) (3) 1 Excavation 0% 2 0 Number Of Basement(S) 0% 3 1 Number of Plinth 0% 4 0 Number Of Podiums 0%. 5 1 Number of Stilt Floor 0% 6 2 Number Of Slabs Of Super Structure 0% Internal Walls, Internal Plaster, Floorings Withing 7 Flats/Premises, Doors And Windows To Each Of 0% The Flat/Premises Sanitary Fittings Within The Flat/Premises, 8 0% Electrical Fittings Within The Flat/Premises Staircases, Lifts Wells And Lobbies At Each Floor 9 Level Connecting Staircases And Lifts, Overhead 0% And Underground Water Tanks The External Plumbing And External Plaster, 10 Elevation, Completion Of Terraces With 0% Waterproofing Of The Building/Wing. Installation Of Lifts, Water Pumps, Fire Fighting And Equipment As Per CFO NOC, Electrical Fitting To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ CRZ 11 NOC, Finishing To Entrance Lobby/S, Plinth 0% Protection, Paving Of Areas Appurtenant To Building/Wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation / Completion Certificate Building Number 02(Type-B) (To Be Prepared For Each Building /Wing Of The Project) Sr.No. Tasks/Activity Percentage Of Work Done (1) (2) (3) 1 Excavation 0% 2 0 Number of Basement(S) 0% 3 1 Number of Plinth 0% 4 0 Number of Podiums 0%. 5 1 Number of Stilt Floor 0% 6 2 Number of Slabs of Super Structure 0% Internal Walls, Internal Plaster, Floorings Withing 7 Flats/Premises, Doors And Windows To Each Of 0% The Flat/Premises Sanitary Fittings Within The Flat/Premises, 8 0% Electrical Fittings Within The Flat/Premises Staircases, Lifts Wells and Lobbies at Each Floor 9 Level Connecting Staircases And Lifts, Overhead 0% And Underground Water Tanks The External Plumbing And External Plaster, 10 Elevation, Completion Of Terraces With 0% Waterproofing Of The Building/Wing. Installation Of Lifts, Water Pumps, Fire Fighting And Equipment As Per CFO NOC, Electrical Fitting To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ CRZ 11 NOC, Finishing To Entrance Lobby/S, Plinth 0% Protection, Paving Of Areas Appurtenant To Building/Wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation / Completion Certificate Building Number 03(Type-C) (To Be Prepared For Each Building /Wing Of The Project) Sr.No. Tasks/Activity Percentage Of Work Done (1) (2) (3) 1 Excavation 0% 2 0 Number of Basement(S) 0% 3 1 Number of Plinth 0% 4 0 Number of Podiums 0%. 5 1 Number of Stilt Floor 0% 6 2 Number Of Slabs Of Super Structure 0% Internal Walls, Internal Plaster, Floorings Withing 7 Flats/Premises, Doors And Windows To Each Of 0% The Flat/Premises Sanitary Fittings Within The Flat/Premises, 8 0% Electrical Fittings Within The Flat/Premises Staircases, Lifts Wells And Lobbies At Each Floor 9 Level Connecting Staircases And Lifts, Overhead 0% And Underground Water Tanks The External Plumbing And External Plaster, 10 Elevation, Completion Of Terraces With 0% Waterproofing Of The Building/Wing. Installation Of Lifts, Water Pumps, Fire Fighting And Equipment As Per CFO NOC, Electrical Fitting To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ CRZ 11 NOC, Finishing To Entrance Lobby/S, Plinth 0% Protection, Paving Of Areas Appurtenant To Building/Wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation / Completion Certificate Building Number 04(Type-D) (To Be Prepared for Each Building /Wing of The Project) Sr.No. Tasks/Activity Percentage Of Work Done (1) (2) (3) 1 Excavation 0% 2 0 Number Of Basement(S) 0% 3 1 Number of Plinth 0% 4 0 Number Of Podiums 0%. 5 1 Number of Stilt Floor 0% 6 2 Number Of Slabs Of Super Structure 0% Internal Walls, Internal Plaster, Floorings Withing 7 Flats/Premises, Doors And Windows To Each Of 0% The Flat/Premises Sanitary Fittings Within The Flat/Premises, 8 0% Electrical Fittings Within The Flat/Premises Staircases, Lifts Wells And Lobbies At Each Floor 9 Level Connecting Staircases And Lifts, Overhead 0% And Underground Water Tanks The External Plumbing And External Plaster, 10 Elevation, Completion Of Terraces With 0% Waterproofing Of The Building/Wing. Installation Of Lifts, Water Pumps, Fire Fighting And Equipment As Per CFO NOC, Electrical Fitting To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ CRZ 11 NOC, Finishing To Entrance Lobby/S, Plinth 0% Protection, Paving Of Areas Appurtenant To Building/Wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation / Completion Certificate Table-B Internal & External Development Works In Respect Of The Entire Registered Phase Common Areas And Proposed Percentage Of Sr.No. Details Facilities, Amenities. (Yes/No) Work Done (1) (5) (2) (3) (4) 1 Internal Roads & Footpaths Yes 0% As per plan 2 Water Supply Yes 0% Common Bore Well Sewerage (Chambers, Lines, Will Be Attached To 3 Yes 0% Septic Tank, STP) AMC Line 4 Storm Water Drains No N.A N.A. 5 Landscaping & Tree Planting No N.A N.A Aggregate Area Of 6 Yes N.A N.A Recreational Open Space 7 Street Lighting Yes 0% N.A 8 Community Buildings No 0% N.A. Treatment And Disposal Of 9 No N.A N.A Sewage And Sullagex Water Solid Waste Management & 10 No N.A N.A Disposal Water Conservation, Will Be Connected To 11 Yes 0% Rainwater Harvesting Bore Well 12 Energy Management No N.A N.A Fire Protection And Fire 13 No N.A N.A. Safety Requirements Electrical Meter Room, Sub- 14 No N.A N.A Station, Receiving Station Other Compound Wall & 15 No N.A N.A Entrance Gate Yours Faithfully, Singnature & Name- Sunil B.Patil ARCHITECT (License No-CA/91/13679)