ANNEXURE -A FORM-2A [See Regulation 3) ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the Financial Year) Date: 10/04/2026. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-l,CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. Quality Assurance Certificate (Certificate No...û..for the year ending 31/03/2026). Subject: Certificate for quality of materials unsed and quality of construction and workmanship for the work of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 being developed Kisan by Khanderao Dhondare). Sir, I Vaijinath Swami have undertaken the assignment of supervision of this real estate project. Our Responsibilitiy. Tocary out the work in accordance with the development permissian and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized aboratory as per prevailing per and applicable standards, to ensure quality of work and workmanship as per prescribed speciications, and as NBC and /or other relevant code of praclce. The detailks of the quality are as follows: 1. Structural Design, Stability and Testing Sr.No. Parameters Yes No Remarks 1. Whether soil investigations of the site has Yes been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2. Whether Structural Engineer has been Yes Name:AKASH D.PATRIKAR appointed for the project? License No: STATE/R2024/APL/M3096 Mobile:8806667884 E mail:akash.patrikar@gmail.com 3 Whether the inspecion registers, site order Yes book and quality control test rogisters are maintained at the ste propety and endorsed by the Engineer-in-Charge? 4 Whether testingfacilities to check quality of Yes material is available at ste? 5. Whether the statuary provisions for disaster Yes resistanca/ earthquake resistant design have been incorporated, specially in case of multi-storeyyed construction? 6. Has suitable cognizance been taken on Yes demarcated food lines and appropriate precautions taken for protecing the site from flooding considering local fooding İssues? 2. Input Materials Sr.No. Parameters Yes No Remarks 1. Whether the following building materials confim to Yes relevant IS/BSINBC Code, or as per industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steeland its alloys Yes (c) Electrical wire, fitings and accessories Yes (d) Plunbingand sanitary fitings Yes 2. Whether regular tests of materials and construcion|Yes products are being done from accedited labs also? If yes, detals of such labs 3. Whether manufacturer test certificate for cement, steel, Yes pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for construcion? Yes (0) What is the source of water ) Has water been tested and approved by Engineer-in Charge before construction? (ii) Has water been tested subsequenty as per requirement? 3. Quality of Workmanship Sr.No. Parameters Yes No Remarks 1. Whether works of all the electrical wiing/ connecions Yes lift installation /other electrical installaions have been caried out under authorized ragstered electrical engineer and whether records of the same has been maintained? 2. Whether al related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized registersd plumbers / sanitary contractors and whether records of the same has been maintained? 3. Whether all the work is being caried out under Yes supervision of experienced and skilled professiona? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Pracice? 4. Whether remedial measures are undertaken to prevent Yes dampness and leakages? If yes, provide details 5. Whether safety precautions are undertaken during| Yes construction activities for all type of workers? 4. Miscellaneous Sr.No. Parameters Yes No Remarks 1. Whether thid party quality inspecion is being caried| Yes out on site during/ater completion of the works? If yes, provide details. 2. Whether anti-termitetreatment has been undertaken for Yes the soil? 3. Whether proper signages have been installed on site/ Yes completed building as per requirement? 4. Whether remedial measures are undertaken to prevent| Yes dampness and leakages? If yes, provide details 5. Whether precautions are undertaken to avoid air Yes pollution during construcion? Please specity. 6. Whether records of al test reports / resultis have been | Yes properly kept in the prescibed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allkottees? 7. Whether al relevant records including sancioned | Yes buiding plans, utlity drawings, various test reports / results have been property kept in the prescribed fomats to be handed over to the assoclatlon of allottees? 8. Any innovative/ cost effectivel green technology has Yes been used for improving qualitiylenergy efficiency? Please speciy Yours Faithfly, Signature of Ehgineer (Site Supervisor) Name: Vaijüinath Swami Qualification (Not less than graduate) License No. (if any) : Phone No: Place:Chhatrapati Sambhajanagar Agreed and accepted by PARVATI CONSTRUCTION Signature of Promoter Proprletor Name:Kisan Khanderao Dhondare Date:10/04/2026