ANNEXURE-A FORM-2A [See Regulation 3] ENGINEER'S CERTIFICATE FOR CQUALITY ASSURANCE (Site Supervisor's Certificate)) (To be submitted at end of the Financial Year) Date: 10/04/2025. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. Quality Assurance Certificate (Certificate No......... for the year ending 31/03/2025). Subject: Certificate for quality of materials unsed and quality of construction and workmanship for the work of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 being developed by Kisan Khanderao Dhondare). Sir, I Vajinath Swami have undetaken the assignment of supervision of this real estate project. Our Responsibility. Tocanry out the work in accordance with the devalopment permission and as per the approved plan, to submt certificate of supervision of wok, to cary out material testing in-situ or in an authortzed laboratory as per prevailing and applicablə standards, to ensure quality of work and workrmnanship as par prascribed speciications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: Stucural Design, Stability and Testing Sr.No. Parameters Yes No Remarks 1. Whether soil investigations of the site has Yes been conducted before the strucural design and soil parameters have been accounted for in the structural design/ drawings? 2. Whether Structural Engineer has been Yes Name:AKASH D.PATRIKAR appointed for the project? License No: STATE/R2024/APLI13096 Mobile:8806667884 E mail:akash.patrikar@gmail.com 3. Whether theinspecion registers, ste order Yes book and quality control test regislers are maintained at the site property and endorsed by the Engineer-h-Charge? 4. Whether testingfaclites to check quality of Yes material is avaable at site? 5. Whether the statuary provislons for disaster Yes resistance/ earthquake resistant design have been incorporated, specially in case of multi-storeyed construcion? 6. Has suitable cognizance been taken on Yes demarcated flood lines and appropriate precautions taken for protecting the site from fiooding considering local flooding issues? 2. Input Materlals Sr.No. Parameters Yes No Remarks 1. Whether the following building materals confirm to Yes relevant IS/BSINBC Code, or as per Industy Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fitings and accessories Yes (d) Plumbing and sanitary fitngs Yes 2. Whether regular tests of materials and onstrucion| Yes products are being done from accredited labs also? If yes, details of such labs 3. Whether manufacturer test certficate for cement, steel,|Yes pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for construcion? Yes (0) What is the source of water (0 Has water been tested and approved by Engineer-n Charge before construction? (ii) Has water been tasted subsequently as per requirement? 3. Quality of Workmanship Sr.No. Parameters YesNo Remarks 1. Whether works of allthe electrical wiring/ connections! Yes lift installation /other electrical installations have been carried out under authorized registered electrical engineer and whether records of the same has been maintained? 2. Whether al related works of plumbing & sanitary Yes incuding installation of water supply sysems, drainage systems, sewage systems, sinks, toilts et. have been carried out under authortzed Iregistered plumbers / sanitary Contractors and whether records of the same has been maintained? 3. Whether all the work is being carried out under Yes Supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and pemissible imits of deviations as per relevant Code of Pracice? 4 Whether remedial measures are undertaken to prevent|Yes dampness and leakages? If yes, provide details 5. Whether safety precautions are undertaken during Yes construcion acivities for all type of workers? 4. Miscellaneous Sr.No. Parameters Yes No Remarks 1. Whether third party qualiy inspecion is being caried Yes out on site during/ater completon of the works? f yes, provide details. 2. Whether anti-termite treatrment has been undertaken for Yes the soi? 3. Whether proper signages have been installed on site! Yes completed buidirng as per requirement? 4 Whether remedial measures are undertaken to prevent| Yes dampness and leakages? Iif yes, provide details 5 Whether precautons are undertaken to avoid air Yes pollution during construcion? Plaase speciy. 6. Whether records of al test reports / results have been| Yes property kept in the prescribed formats and whether the same are avaiable at site for viewing by alottees and to be handed over to the association of allottees? 7. Whether all relevant records incuding sancioned Yes buikding plans, utlity drawings, various test reports I results have been property kept in the prescribed formats to be handed over to the assoclation of allotees? 8. Any innovative/ cost efecive/ green technology has Yes been used for improing qualitylenergy efficiency? Please specify Yours Faitihully, Signature óf Engineer (Site Supervisor) Name: Valijinath Swami Qualification (Not less than graduate) License No. (if any) : Phone No: Place:Chhatrapati Sambhajanagar Agreed and accepted by PARVATI CONSTRUCTION Signature of Promater Proprietor Name:Kisan Khanderao Dhondare Date:10/04/2025