Yct"d,t ,Aql ANNEXURE.A FORM-2A [See Regulation 3] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certifl cate)) (To be submitted at end of the Financial Year) Date: 05/04/2024 To, The Kisan Khanderao Dhondare, Gut No.77P,Golwadi, Chhatrapati Sambhajinagar-431 001 Quality Assurance Gertificate (Certificate No.2023-24101 for the year ending 3110312024). Subiect: Certifcate lor quality of materials unsed and quality ol construction and wo*manship for the viork of 'PARVATI HILLS" having MahaRERA Registration Number. P51500055239 being developed by Kisan Khanderao Dhondare). Sir, I Vaijinah Sarang Swami have undertaken the assignment of superyision of this real eshte proJect. Our Responsibitrty. To carry out the work in accordance with the developmenl permission and as per lhe approved plan, to submit certilicate of supervision ofwork, to carry out material testing in-situ or in an authorized hbonatory as per prevailing and applicable standads, lo ensure quality ofwork and wo*manship as p€r prascribed specificatbns, and as por NBC and I or other relevant code of practice. The details ofthe quality are as follows: 1. Structuml Design, Stability and Testing Sr.No. Parameters Yes No Remarks 1 Whether soil investigations of the site has Yes been mnducted before the structucl design and soil parameters have been accounted for in the structural design/ drawings? 2 Whelher Structural Engineer has been Yes Name:AKASH D.PATRIKAR appointed for the poject? License No: STATE/R/2o24IAPU1 3096 Mobib:8806667884 E- mail:akash.patrika@gmail.mm 3. Whether the inspection registers, site order Yes book and quality control test registers are maintained at the site pmperly and endorsed by the Engineer-in-Charge? 4 Whether testing lacilities to check quality of Yes material is available at site? 5 Whether the statuary provisions for disasler Yes resistance/ earthquake resistant design have been incorporated, specially tn case of multi-storeyed mnstruction? 6 Has suitabb cognizance been bken on demarcated flood lines and appmpriate precautions taken for protecting the site from flooding considering local flooding issues? 2. lnput Materials Sr.No Param€ters Yes No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per lndustry Standards? lf yes, provide details: (a)Cement, concrete and coarse aggregate (b)Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular lests of materials and eonstruction Yes products are being done from accredited labs also? [f yes, details of such labs 3 Whether manufacturer test certificate lor cement, steel, Yes pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for construction? Yes (i) What is the source ol water? (ii) Has water been tested and approved by Engineer-in Charge belore construction? (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanship Sr No. Parameters Yes No Remarks 1 Whether works of all the electrical wiringl connections/ Yes lift installation / other electrical installations have been carned out under authonzed /registered electrical engineer and whether records of the same has been maintained? 2 Whether all relaled works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been canied out under authorized /registered plumbers / sanitary contractors and whether records ol the same has been maintained? 3 Whether all the work is being canied out under Yes supervision ol experienced and skilled pofessional? Further, whether ttre workmanship and quality is satisfactory and up lo the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whelher remedial measures are undertaken to prevent Yes dampness and leakages? lf yes, provide details Whether safety pccautions are undertaken during Yes constructron activities for all type of workers? 4. Miscellaneous Sr.No. Parameters Yes No Remarks 1 Wheher third party quality inspection is being canied Yes out on site during/afrer completon of the works? lf yes, provide dehils. 2 Whether anti-termite treatment has been undertaken for Yes the soil? 3. Whelher proper signages have been installed on sitei Yes completed building as per requirement? 4 Whether remedial measures are undertaken to pEvent Yes dampness and leakages? lf yes, povide details 5. Whether precautions are undertaken to avoid air Yes pollution during construction? Please specify. 6 Whether records of all test reports / results have been Yes poperly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports / results have been poperly kept in the prescribed formats to be handed over to the assooation of allottees? 8 Any innovative/ cost effective/ green technology has Yes been used for improving quality/energy efliciency? Please specify h Yours Signature of (Site Supervisor) Name: Vaijinath Sarang Swami Qualilication (Not less than graduate) License No. (if any) : Phone No: 9172673711 Place:Chhatrapati Sambhajianagar Aoreed and acceoted bv ?ARYAil CONSIRUCIIOI 1qD- Sionature of ProkGr loprtrtor Name:Kisan Khanderao Dhondare Date.0510412024