AKASH D. PATHRIKAR 0 5, wa h e u ru & 5 s J8llg",lll?a.tel,?.'JJl Aurangabad_431 005 Annexure -B FORM.2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the Time of Registration of Ongoing Project and Wthdrawals of Money from Designated Account) Date: 31/07/2026. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. Subject Certificate of Cost lncurred for Development of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 (Only Applicable after project registration) being developed by Kisan Khanderao Dhondare) Sir, 1. AKASH D. PATHRIKAR have undertaken assignment of certifying Estimated Cost for I"PARVATI I HILLS" having MahaRERA Number P51500055239 (Onty Appticable after project registration) being developed by Kisan Khanderao Dhondare) 2. We have estimated the cost of Civil,MEP and allied works required for completion of the apadmenl and propionate completion of intemal and external work of the projects as per specification mentioned in, agreement of sale our estimated cosi calculation are based on the drawings plans made available to us for the project under reference by the developer/ Consultants. The Schedule of items a Quantity require for the entire work as calculated by Akash D.Patrikar Quantity Surveyo/' appointed by the Developer/ Engineer. The assumption ofthe cost of material, labor and other input made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. H D. PATHRIKT trc TRUCTURE,B.E. CIUL STAT E/R/2024lAPL/13096 3. We estimate Total Estimated Cost of comptetion of the aforesaid project under reference as Rs.14, 54, 12,1611 fl'otal of TableAand B). Atthetime of registration. The estimated Total Cost of proiect is with reference to the Civit, MEP and allied works required to be completed of the apartment and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale and for the propose of obtaining occupancy certificate /completion certificate of building(s)Ming(s) / LayouUPlotted Development from the City and lndustrial Development Corporation of Maharashtra Limited being the planning authority under whose lurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs.2, 98, 22,829|$olal of Table A and B). The amounl of Estimated Cost lncuned is calculated on the base of input material/services used and units cost of items. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the apartment and proportionate completion of intemal & e(emal works, as per specifications menlioned in agreement of sale, of the proiect is estimated at Rs. 1 1,55,89,3321 ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartment and proportionate intemal & extemal works, as per specilications mentioned in.agreement of sale of the aforesaid prc{ect as completed on the date of this certificate is given in Table A and B Below. . TABLE A Building/ wing/LayouUPlotted Development bearing Number Gut No.77P, OR Called PARVATI HILLS (To be prepared separately for each building/wing/layouUplotted development of the Real estate ProJect) Sr. No Particulars Amounts (1) (2) (3) 1 Total Estimated cost of the Rs. 14, 54, 12,1611 buildingMing/LayouUPlotted development as on date of Registration is I Cost lncurred as on date of certificate Rs. 2, 98, 22,8291 3 Work done in Percentage 20.21% (as Percentage of the estimated cost) 4. Balance Cost to be lncurred Rs. 1 1,55,89,33?- (Based on Estimated Cost) E Cost lncurred on Additional / E(ra ltems Rs. 0.00 il ;H D. PA M. ICfURE, tJ E. CIUL STAI v2024/APL/13096 Not included in the Estimated Cost (Table-C TABLE B Intemal & External Development works in respect ol the registered phase Sr. No. Particulars Amounts (1) (2) (3 1 Total Estimated cost of the lnlernal and Rs.0.001 External Development Works including amenities and Facilities in layout as on date of Registration is 2. Cost lncurred as on date of certificate Rs.0.001 3. Work done in Percentage 0.000/o (as Percentage of the estimated cost) 4 Balance Cost to be lncuned Rs.0.001 (Based on Estimated Cost) E Cost lncurred on Additional / Extra ltems Rs. 0.001 not included in the Estimated Cost (Table.C) Yours Faithfully, Akash D.Pathrikar Signature of Engineer M.E.S I iIUCTURE,B.E. CIUL (License No. ) srnre/ R/zoz4lAPL/ 1 3096 Agreed and Accepted by PAm/An coN TION f ?nPdotor Signature of promoter Name: Kisan Khaderao Dhondare Dale:3110712026. - Note 1' The scope of work is to complete entire Real Estate Project as per drawings approved from time to time as per specifications mentioned in agreement of sale. 2. (t) Quantity survey can be done by office of Engineer or can be done by an independent euantity surveyor, whose certificate of quantity calculatdd can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name ofthe person in the office of Engineer, who is responsible for the quantity calculated should be mentioned al lhe place marked ('). 3. Balance cost to be incuned (4) may varyfrom Difference between Total estimated cost (1) and actual cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is estimated cost ant deviation in quantity required for development in real estate proiect will result in amendment of the cost incuned/ to be incurred. . 4. All components of work with specifications are indicalive and not exhaustjve. 5. Please specify if there are any deviation/qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra i Additional/ Deleted lt6ms Considered in Cost. (Which were not parts of the original Estimate of Totat Cost) Sr.No List of Exka/Additional/ Deleted ltems . . Amount (ln Rs.) TKASH D. PATHRIKAR .E.STRUCTURE, B. E. CIUL STNE/R|20241APV13096