form- 2 Tune 202 AKASHD. PATHRIKAR M.E.(Structure), B.£.Civil 05,Waheguru Complex,Garkheda Parisar, Aurangabad-431 005 Annexure -B FORM-2 (See Regulation 3] ENGINEERS CERTIFICATE Project and Withdrawals of (To be submitted at the Time of Registration of Ongoing Money from Designated Account) Date: 10/07/2025. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. Cerificate of Cost Incurred for Development of "PARVATI HILLS" having MahaRERA Subject Registration Number. P51500055239 (Only Applicable after project registration) being developed by Kisan Khanderao Dhondare) Sir, Estimated Costfort"PARVATI 1. IAKASH D. PATHRIKAR have undertaken assignment of certilying (Only Applicable after project HILLS" having MahaRERA Number P51500055239 Dhondare) registration) being developed by Kisan Khanderao 2. We have estimated the cost of Civil,MEP and allied works required for compleion of the apartment of the projects as per specification and propionate completion of intermal and extermal work are based on the drawings plans mentioned in agreement of sale our estimated cost caculation developer Consultants. The Schedule made available to us for the project under reference by the Akash D.Patrikar Quantity Surveyor" by of items a Quantity require for the entire work as calculated cost of material, labor and other input appointed by the Developer/ Engineer. The assumptionbyofustheto ascertain/confirm the above analysis made by developer, and the site inspecion carried out given to us. We estimate Total Estmated Cost of completion of the aforesaid project under reference as Rs.14, 3. The estimated Total Cost of project S4, 12,161- (Totalof Table A and B). At the time of registration. to be completed of the apartment and iswith reference to the Civil, MEP and allied works required completion of internal & external works, as per specifications mentioned in agreement proporionate K12ESTRUCTURE,B.E. CIVIL D. PATHRIKAR STATE/R/2024/APL/13096-- of sale and for the propose of obtaining occupancy certificate Icompletion certificate of buiding(syWing(s) / LayoutPlotted Developnant from the City and Industrial Development Corporation of Maharashtra Limited being the planning authorty under whose jurisdicion the aforesaid project is being implemented. 4. The Estimated Cost Incued tilldate is calculated at Rs.2, 09,84,448-(Total of Table A and B). The amount of Estimated Cost Incurred is calaulated on the base of input material/services used and units Cost of itenms. 5 The Balance cost of Completion of the Civil, MEP and Allied works of the apartment and proportionate completion of internal & extermal works, as per specifications mentioned in agreement of sale,of the project is estimated at Rs. 12,44,27,713/-( Total of Table A and B). 6. lcertify that the Cost of the Civi, MEP and allied work for the apartment and proportionate internal & extermal works, as per specifications mentionsd in agroement of sale of the aforesaid project as completed on the date of this cartficate is given in Table A and B Below. TABLE A Building/ wing/LayoutPlotted Development bearing Number Gut No.77P, OR Called PARVATI HILLS (Tobe prepared separately for each building/winglayoutplotled development of the Real estate Projec) Sr. No. Particulars Amounts (1) (2) (3) 1. Total Estimated cost of the Rs. 14,54, 12,161/ building/Wing/LayoutPlotted development as on date of Registration is 2. Cost Incured as on date of cerificate Rs. 2, 09, 84,448/ Work done in Percentage 14.43% 3. (as Percentage of the estimated cost) 4. Balance Cost to be Incurred Rs. 12,44,27,713/ (Based on Estimated Cost) Rs. 0.00 5 Cost Incured on Additional / Extra Items Not incuded in the Estimated Cost (Table-C D,PATHRIKAR ME.STRUCTURE,B.E. CIVIL STATE/R2024/APL/13096 TABLE B Internal& External Development works inrespect of the registered phase Sr. No. Pariculars Amounts (1) (2) 1 Total Estimated cost of the Internal and (3) Rs.0.00/ External Development Works including ameniies and Facilities in layout as on date of Registration is 2. Cost Incurred as on date of cerificate Rs.0.00/ 3. Work done in Percentage 0.00% (as Percentage of the esimated cost) 4 Balance Cost to be lncurred Rs.0.00/ (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0.00/ not incuded in the Estimated Cost (Table-C) Yours Faithfully, Akash D.Pathrikar AKASH DPATHRIKAR Engineer M.E.STRUCTURE, B.E.CIVIL Signature of ATE/R/2024/APL/13096 (Licanse No. ....) Agreed and Accepted by PARVATI CONSTRUCTION Proprietor Signature of promoter Name: Kisan Khaderao Dhondare Date: 10/072025 Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time as per specificaions mentioned in agreement of sale. 2. (") Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by ofica of Engineer, the name of the person in the office of Engineer, who is responsible for the quanity calculated should be mentioned at the placa marked ("). 3. Balance cost to be incurred (4) may vary fronm Diference between Total estimated cost (1) and actual cost incurred (2) due to deviation in quantity required /escalation of cost etc. As this is estimated cost ant deviation in quantity required for development in real estate project wilresult in amendment of the Cost incurred/ to be incured. 4. All components of work with specifications are indicative and not exhaustie. 5. Please specify if there are any deviation/qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extral AdditlonalV Deleted Mems Considered in Cost. (Which were not parts of the original Estimate of Total Cost) Sr.No List of ExtralAdditional Deleted Items Amount (In Rs.) D. PATHRIKAR M.E.STRUCTURE,B.E. CIVIL STATE/R/2024/APL/13096