SARTHAK ASSOCIATES cr.Pmzox€ lt^oE cErlma. ,aozoN€ MAlLAt aartl6aSlD.a!121o TARCHITECTSt INTERIORS DESIcNERS r VALU ERS. Annexure A Form 1 lsee Regulation 3l ARCHITEC'S CERTIFICATE (To be submitted at the Time of Registration of ongoing project and withdrawals of Money from Designated Account) Date: 3t/07 /2026 To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar- , CtDCO, Walui Mahanagar, Chhatrapati Sambhajinagar-431001. sub: certificate of Percentage of completion of construction work ,,pARVAT| HILLS,, having MahaRERA Registration Number p515000s5239 (only applicable after ilroject registration) being developed by Kisan Khanderao Dhondare. Sir, I santosh Mahadeo Sakhare have undertaken assignment as Architect/ Licensed Surveyor of certifr/ing percentage of completion of construction work of ,,PARVAT| HlLLs,, having MahaRERA Registration Number P51500055239 (only applicable after project registration) being developed by Kisan Khanderao Dhondare. Based on lnspection, with respect in layout/ each of building /wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done, for each of the buildingfwing of the Real Estate project under MahaRERA is as per Tabre A herein berow. The percentage of the work executed with respect to each of the activity of the entire phase is detaired in Ta bre B. TABtE.A (Layout/ Building/Wing Number ............... (To be prepared separately for each Layout/Building,/Wing of the Project) Sr.No. Tasks/Activity Percentage of Actual work Done (1) (2) ( As on date of the Certificate) (2) 1 Excavation 20.5r% 2. Basement ( if any ) N.A 3 Podium ( if any) N.A 4 Plinth 20.5L% 5 Still Floor N.A 6 Slab of Super structure N.A 7 lnternal wall internal plaster, Doors and windows with N,A Flats/ Premises 8. SanitarI i ittin8s with Flats/ Premlses N,A 9 Staircas., Lift,wells and Lobbies at each floor level N.A overhead and under8round water Tanks. 10. External plumbing and external plaster, elevation, N.A completion of terraces with waterproofing of the Buildin" ^.^,/ings. 11 lnstall.'li jI1 .f Lifts, water Pumps, Fire Fitting Fittings and NA. Equipment as per cFO NOC,Electrlcal Fitting, mechanical equipment, compliance to condition of environment/CRZ NOC, Finishing to entrance lobby's, plinth protection. Paving of area appurtenant to Building/Wing. compound Wall ;rn I all other requirement as may be required to complete project as per specifications in agreement of sale. An / cllrer activities. TABIE-B Common Area (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr.No Common area of Facilities Proposed Pe rcentage of. Details ActualWork.done (1) (2) (Yes/No) I (s) (As on 0tte of (3) certifiute) (4)\ '- 1 lnternal Roads and Footpath Yes 20.57./" Concrete 2 Water Supply Yes 20.5r% . Borewell 3 Sewerage (Chamber Lines, Septic Yes 20.51% Yes Tank, STP. 4. Storm Water Drains N.A N.A N.A 5 Landsca ping & Tree Planting Yes 20.5t% Ga rde n 6 Street Lighting Yes 20.5t% Along Road 7 Community Building N.A N.A. N.A. 8 Treatment and disposal of sewage N.A N.A N,A and sullage water. 9 Solid Waste Management & N,A N.A N.A Disposal 10 Water Conversion and rain water Upto Borewell 20.51% N.A harvesting 11. Energy management N.A N.A N,A 12. Fire protection and fire safety N.A N.A N.A req uirement 13. Electrlcal meter room, substation Meter 20.51% N.A t4. Other (Optlon to add more). N,A N.A N.A Yours Faithfully, Ar ahadeo sakhare cAxlo(w v29s Agree PAmr rl @ signatu re of promtl6Pdrtol Name: Kisan Khanderao Dhondare Date:37/07 /2026.