form|-fue-20S SARTHAK ASSOCIATES c7,PROZONE TRADE CENTRE. PROZONE MALL,AURANGABADA31210. • ÀRCH|TECTS INTERIORS DESIGNERS VALUERS • Annexure A Form 1 [See Regulation 3] ARCHITEC'SCERTIFICATE (To be submitted at the Time of Registration of Ongoing Project and Withdrawals of Money from Designated Account) Date: 10/07/2025 To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. having MahaRERA Sub: Certificate of Percentage of Completion of Construction Work "PARVATI HILLS" by Registration Number P51500055239 (Only applicable after project registration) being developed Kisan Khanderao Dhondare. Sir, of certifying ISantosh Mahadeo Sakhare have undertaken assignment as Architect/ Licensed Surveyor Registration percentage of completion of construction Work of "PARVATI HILLS" having MahaRERA Khanderao Number P51500055239 (Only applicable after project registration) being developed by Kisan Dhondare. Estate Project. I Based on Inspection, with respect in layout/ each of building /wing of the aforesaid Real certify that as on the date of this certificate, the percentage of work done, for each of the building/wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work in Table B. executed with respect to each of the activity of the entire phase is detailed TABLE-A (Layout/ Building/Wing Number (To be prepared separately for each Layout/Building/Wing of the Project) Sr.No. Tasks/Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) (2) 1. Excavation 14.43% 2. Basement (if any ) N.A 3. Podium ( if any) N.A 4. Plinth 14.43% 5. StillFloor N.A 6. Slab of Super structure N.A 7. Internal wall internal plaster, Doors and windows with N.A Flats/ Premises 8. Sanitary Fittings with Flats/ Premises N.A 9 Staircase, Lift, Wells and Lobbies at each floor level N.A Overhead and underground Water Tanks. 10. External plumbing and external plaster, elevation, N.A completion of terraces with waterproofing of the Building/Wings. 11. Installation of Lifts, Water Pumps, Fire Fitting Fittings and NA. Equipment as per CFO NOC,Electrical Fitting, mechanical equipment, compliance to condition of environment/CRZ NOC, Finishing to entrance lobby's, plinth protection. Paving of area appurtenant to Building/Wing. Compound Wall and all other requirement as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) In respect of the Registered Phase/Project Number Sr.No. Common area of Facilities Proposed Percentage of Details (1) Actual VWork done (2) (Yes/No) (5) (As on date of (3) certificate) (4) 1. Internal Roads and Footpath Yes 14.43% Concrete 2. Water Supply Yes 14.43% Borewell 3 Sewerage (Chamber Lines, Septic Yes 14.43% Yes Tank, STP. 4. Storm Water Drains N.A N.A. N.A 5. Landscaping & Tree Planting Yes 14.43% Garden 6. Street Lighting Yes 14.43% Along Road 7. Community Building N.A N.A. N.A. Treatment and disposal of sewage N.A N.A N.A and sullage water. 9. Solid Waste Management & N.A N.A N.A Disposal 10. Water Conversion and rain water Upto Borewell 14.43% N.A harvesting 11. Energy managemnent N.A N.A N.A 12. Fire protection and fire safety N.A N.A N.A requirement 13. Electrical meter room,substation, Meter 14.43% N.A receiving station. 14. Other (Option to add more). N.A N.A N.A Yours Faithfully, CA2004/ Ar. Santosh Mahadeo Sakhare 4295 (License No.CA/2004/34295) RC Agree and Accepted by, PARVATI CONSTRUCTION Signature of promoter Proprietor Name: Kisan Khanderao Dhondare Date: 10/07/2025.