Tuot -%\ AKASH D. PATHRIKAR M.E.(Structure), B.E.Civil 05.Waheguru Complex,Garkheda Parisar, Aurangabad-431005 Annexure -B FORM.2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the Time of Registration of Ongoing project and Withdrawals of Money from Designated Account) Aal€:06fi712024. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. subiect: certificate of cost tncuned for Development of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 (only Applicable after project registration) being developed by Kisan Khanderao Dhondare) Sir, 1. AKASH D. PATHRIKAR have undertaken assignment of certifying Estimated cost fo, t,,pARVATt I HILLS" having MahaRERA Number p51500055239 (onty Appticabte after project registration) being developed by Kisan Khanderao Dhondare) 2. We have estimated the ctst of Civil,MEP and allied works required for completion of the apartment and propionate completion of inlernal and external work of the projects as per specification mentioned in agreement of sale our estimated cosl calculation are based on lhe drawings plans made available to us for the project under reference by the developer/ Consultants. The Schedule of items a Quantity require for the entire work as calculated by Akash D.Patrikar euantity Surveyor,' appointed by the Developer/ Engineer. The assumption of the cost of malerial, labor and other input made by developer, and the site inspection carried out by us to ascertain/mnfirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs.14, 54' 12,161/- (Total of Table A and B). At the lime of registration. The estimated Totat Cost of project is with reference to the civil, MEp and allied works required to be completed of the apartment and proportionate mmpletion of intemal & external works, as per specifications mentioned in agreement M,E.STRUC|URE,B.E. CIVIL sr AT E I Rl 2024 IAP L/ 1 3 0 96 of sale and for the propose of obtaining occupancy certilicate /completion certificate of building(sfYVing(s) / LayouUPlotted Development from the City and lndustrial Development Corporation of Maharashtra Limited being the planning authority under whose jurisdiction the aforesaid proiect is being implemented. 4. The Eslimated Cost lncurred till date is calculated at Rs.1, 07, 09,4931(Total of Table A and B). The amount of Estimated Cost lncuned is calculated on the base of input material/services used and units cost of items. 5. The Balance cost of Completion of the Civil, MEP and Allied \,!orks of the apartment and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estrmated at Rs. 13,47,02,668/- (Total ofTable A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartment and proportionate internal & e(emal works, as per specilications mentioned in agreement of sale of the aforesaid proiect as completed on the date of this certificate is given in Table A and B Below. TABLE A Building/ wing/LayouVPlotted Development bearing Number Gut No.77P, OR Called PARVATI HILLS (To be prepared separately for each building/wing/layouuplotted development of the Real estate Proiect) Sr. No Particulars Amounts (1) (2) (3) 1 Total Estimated cost of the Rs. 14, 54, 12,1611 buildingMing/LayouVPlotted development as on date of Registration is 2. Cost lncurred as on date of certificate Rs. 1, 07,09,4931( 3 Work done in Percenlage 7.36% (as Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs. '13,47,02,6681 (Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems Rs.0.00 Not included in the Estimated Cost (Table-C M.E.STRUCTURE,E. E. STATE/R/2024lAPL/: TABLE B lnternal & External Development works in respect of the registerad phase Sr. No Particulars Amounts (1) (2) (3) 1 Total Estimated cost of the lnternal and Rs.0.001 External Development Works including amenities and Facilities in layout as on dale of Registration is 2 Cost lncurred as on date of certificate Rs.0.001 3 Work done in Percentage 0.00% (as Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs.0.001 (Based on Estimated Cost) 5 Cost lncuned on Additional / Extra ltems Rs.0.001 not included in the Estimated Cost (Table-C) Yours Faithfully, M.E.STRUCTURE,B.E. CiUL Akash D.Pathrikar sT ATEI Rl 2024/APL/1 3096 _ Signature of Engineer (License No. . .. ) Agreed and Accepted by FARVATI COIISTRUCTIO}I r@- o?^nrietCf Signature of promoter Name: Kisan Khaderao Dhondare Date:0610712024 * Note '1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time as per specifications mentroned in agreement of sale. 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculatod by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quanlity calculated should be mentioned at the place marked ('). 3. Balance cost to be incurred (4) may vary from Difference between Total estimated cost (1) and actual cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is estimated cost ant deviation in quantity required for development in real estate project will result in amendment of the cost rncurredl to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviation/qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra / Additional/ Deleted llems Considered in Cost. (Which were not parts of the original Estimate of Total Cost) Sr.No List of Extra/Additional/ Deleted ltems Amount (ln Rs.) M.E.STRUCTURE,B,E. CIUL STATE/ R/20 24lAP L/ 1 3 09 6