9+erq AKASH D. PATHRIKAR M. E. (Structu re). B.E.Civrl 05.Waheguru C om plex. G a rkheda Parisar. Aurangabad-431005 Annexure -B FORM.2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the Time of Registration of Ongoing Project and Withdrawals of Money from Designated Account) Date: 1011012024. To, The Kisan Khanderao Dhondare. Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431 00'l Subject: Certificate of Cost lncurred for Developrnent of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 (Only Applicable after project regiskation) being developed by Kisan Khanderao Dhondare) Sir, 1. I AKASH D. PATHRIKAR have undertaken assignment of certifying Estimated Cost for I"PARVATI HILLS" having MahaRERA Number P51500055239 (Only Appticabte after project registration) being developed by Kisan Khanderao Dhondare) 2. We have estimated the cost of Civil,MEP and allied works required for completion of the apartment and propionate completion of intemal and external work of the pro.iects as per specification mentioned in agreemenl of sale our estimated cost calculation are based on the drawings plans made available to us for the project under reference by the developel Consultants. The Schedule of items a Quantity require for the entire work as calculated by Akash D.Patrikar Quantity Surveyor" appointed by the Developer/ Engineer. The assumption of the cost of material, labor and other input made by developer, and the site inspection carned out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completron ofthe aforesaid project under reference as Rs.14, 54, 12,1611(Total of Table A and B). At the time of registration. The estimated Total Cost of prolect is with reference to the civil, MEP and allied works required to be completed of the apartment and proportionate completion of tnternal & external works, as per specifications mentioned in agreement of sale and for the propose of obtaining occupancy c€rtificate /completion certilicate of H D. PATIII .STRUCTURE ,8.E. CIVIL s TATE/R/2024 /APL|130s6 building(s)Ming(s) / LayouUPlotted Development from the City and lndustrial Development Corporalion of Maharashtra Limited being the planning authority under whose jurisdiction the aforesaid proiect is being implemented. 4. The Estimated Cost lncurred till date is calq,lated at Rs. 1,44, 18,0291 (Total of TableAand B). The amount of Estimated Cost lncuned is calculated on the base of input malerial/services used and units cost of items. 5. The Balance cost of Completion of the Civil, MEP and Allied works of lhe apartment and proportionate completion of intemal & external works, as per specifications mentioned in agreement of sale, of the pro.iect is estimated at Rs. . 13, 09, 94,132/- (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartmenl and proportionate internal & external works, as per specifications mentioned in agreement of sale of the aforesaid project as completed on the date of this certificate is given in Table A and B Below. TABLE A Building/ wing/LayouuPlotted Development bearing Number Gut No.77P, OR Called PARVATI HILLS (To be prepared separately for each building/wing/layouUplotted development olthe Real estate Project) Sr. No Particulars Amounts (1) 2 (3) 1 Total Estimated cost of the Rs. 14, 54, 12,16'11 building/Wing/LayouUPlotted development as on date of Registration is 2 Cost lncurred as on date of certilicate Rs. 1,44, 18,029/- 3 Work done in Percentage 9.92o/" (as Percentage of the estimated cost) 4 Balance Cost to be lncuned Rs. 13,09,94,1321 (Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems Rs.0.00 Not included in the Estimated Cost (Table-C I(ASH D. PATFI VI. E.STRUCIURE. E STATE/R/2024/APL D TABLE B lnternal & Extemal Developmenl works in respect of the registered phase Sr. No Particulars Amounts (1) (2t (3) 1 Total Estimated cost of the lnternal and Rs.0.001 External Development Works including amenities and Facilities in layout as on date of Registration is 2. Cost lncurred as on date of certificate Rs.0.00/- 3 Work done in Percenlage 0 00% (as Percentage of the estimated cost) 4. Balance Cosl to be lncuned Rs.0.001 (Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems Rs.0.001 not included in the Estimated Cost (Table-C) Yours Faithfully, \ M,E.STRUCTURE,B,E. CIVIL Akash D.Pathrikar sT p[EI Rl 2024lAPLl 1 _ 3096 Signature of Engineer (License No. . .... ...) . Agreed and Accepted by PARVATI CONSTRUCTIOII ,--: A Proprietor Signature of promoter Name: Kisan Khaderao Dhondare Date:1011012024 ' Note 1. The scope of work is to mmplete entire Real Estate Project as per drawings approved from lime to time as per specifications mentioned in agreement of sale. 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appoinled by Developer, the name has to be mentioned at the place marked (') and in case guantity are being calculated by office of Engineer, the name of the person in the ofiice of Engineer, who is responsible for lhe quantity calculated should be mentioned at the place marked (-). 3. Balance cost to be incuned (4) may vary from Difference between Total estimated cost (1) and actual cosl incuned (2) due to deviation in quantity required / escalation of cost etc. As this is estimated cost ant deviation in quantity requked for development in real estate project will result in amendment of the cost incurred/ to be incuned. 4. All components of work with specifications are indicative and not exhaustive 5. Please specily if thete are any deviation/qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table C Lisl of Exha / Additional/ Deleted ltems Considered in Cost. (\{hich were not parts of the original Estimate of Total Cost) Sr.No List of Extra/Additional/ Deleted ltems Amount (ln Rs.) M.E.STRUCTURE,B.E. CIVIL STATEi R/2024lAPL/ i 30 96