\r$ qq ffi SARTHAK ASSOCTATES CT,PiOZONE TRAOE CENTRE, PROZONE MAlI,AURANGASAO.43121O, .ARCHITECTS. tNTERtORS DESTGNERS . VALUERS. Annexure A Form 1 [See Regulation 3] ARCHITEC'5 CERTIFICATE (To be submitted at the Time of Registration of ongoing project and withdrawals of Money from Designated Account) Date: 10/L0/2024 To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar- , CtDCO, Walu.j Mahanagar, Chhatrapati Sambhajinagar-431001. sub: certificate of Percentage of completion of construction work ,,PARVAT| HlLLS,, having MahaRERA Registration Number p51500055239 (only applicable after project registration) being developed by Kisan Khanderao Dhondare. Sir, I santosh Mahadeo Sakhare have undertaken assignment as Architect/ Licensed surveyor of certifuing percentage of completion of construction work of ,,PARVATI HlLLs,, having MahaRERA Registration Number P51500055239 (only applicable after project registration) being developed by Kisan Khanderao Dhondare. Based on lnspection, with respect in layout/ each of building /wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done, for each of the building/wing of the Real Estate project under MahaRERA is as per Tabre A herein berow. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A (Layout/ Building/Wing Number (To be prepared separately for each Layout/Building/Wing of the Project) 5r.No. Tasks/Activity Percentage of Actual Work Done (1) l2l ( As on date of the Certificate) (2) 1 Excavation 9.92% 2. Basement ( if any ) N.A 3 Podium ( if any) N.A 4 Plinth 9.92./o 5 Still Floor N.A 6 Slab of Super structure N.A 7 lnternal wall internal plaster, Doors and windows with N.A Flats/ Premises 8 Sanitary Fittings with Flats/ Premises N,A 9 Staircase, Lift,Wells and Lobbies at each floor level N,A Overhead and underground Water Tanks. 10. External plumbing and external plaster, elevation, N.A completion of terraces with waterproofing of the Building/Wings. 11. lnstallation of Lifts, Water Pumps, Fire Fitting Fittings and NA Equipment as per CFO NOC,Electrical Fitting, mechanical equipment, compliance to condition of environment/CRZ NOC, Finishing to entrance lobby's, plinth protection. Paving of area appurtenant to Building/Wing. Compound Wall and all other requirement as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B Common Area (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr.No. Common area of Facilities Proposed Percentage of Deta ils Actua I Work done (1) (21 (Yes/No) (s) ( As on date of (3) certificate) {41 1, lnternal Roads and Footpath Yes 9.92% Concrete 2 Water Supply Yes 9.92./" Borewell 3 Sewerage (Chamber Lines, Septic Yes 9.92./" Yes Tank, STP. 4 Storm Water Drains N.A N.A. N,A 5 Landscaping & Tree Planting Yes 9.920/. Garden 6 Street Lighting Yes 9.920/a Along Road 7 Community Building N.A N.A. N.A. 8. Treatment and disposal of sewage N.A N.A N.A and sullage water. 9 Solid Waste Management & N,A N.A N.A Disposal 10. Water Conversion and rain water Upto Borewell 9.92% N.A harvesting 11. Energy management N.A N.A N,A 'l-2. Fire protection and fire safety N,A N.A N,A requirement 13 Electrical meter room, substation, Meter 9.92./" N,A receiving station. t4. Other (Option to add more) N.A N.A N.A Yours Faithfully, x A\ Ar. Sa ntosh Mahadeo Sakhare (License No.CAl2004 /34295\ PARVATI CONSTRUCTIOT.I Agree and Accepted by, Prgpristoa .A @- Signature of promoter Name: Kisan Khanderao Dhondare Date:70llO/2024.