gloa ^,N AKASH D. PATHRIKAR M. E. (Structure). B.E.Civil 05.Waheguru Complex.Garkheda Parisar, Aurangabad-431 005 Annexure -B FOR[r-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the Time of Registration of Ongoing Project and Withdrawals of Money from Designated Account) Dale: 1510112025. To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001 Subject: Certificate of Cost lncuned for Development of "PARVATI HILLS" having MahaRERA Registration Number. P51500055239 (Only Applicable after project registration) being developed by Kisan Khanderao Dhondare) Sir, 1. AKASH D. PATHRIKAR have undertaken assignment of certifying Estimated Cost for I"PARVATI I HILLS" having MahaRERA Number P5'1500055239 (Only Applicable after project registration) being developed by Kisan Khanderao Dhondare) 2. We have estimated the cost of Civil,MEP and allied works required for mmpletion of the apartment and propionate completion of intemal and external work of the projects as per specification mentioned in agreement of sale our estimated cost calculation are based on the drawings plans made available to us for the project under reference by the developer/ Consultants. The Schedule of items a Quantity require for the entire work as calculated by Akash D.Patrikar Quantity Surveyor" appointed by the Developer/ Engineer. The assumplion of the cost of material, labor and other input made by developer, and the site inspection canied out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs.14, 54, 12,1611 (Total ofTable A and B). At the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied wo*s required to be completed of the apartment and proportionate mmpletion of internal& external works, as per specifications mentioned in agreement 5 tAt of sale and for the propose of obtaining occupancy certiflcale /completion certifcate of building(s)Ming(s) / LayouuPlotted Development from the City and lndustrial Development Corporation of Maharashtra Limited being the planning authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs.1, 62, 14,6851(Total of Table A and B). The amount of Estimated Cost lncuned is calculated on the base of input mate al/services used and units cost of items. 5. The Balance cost of Completion of the Civil, MEP and Allied r,vorks of the apartment and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, ofthe project is estimated at Rs. 12,9'1,97,4761 (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartment and proportionate internal & e(ernal works, as per specifications mentioned in agreement of sale of the aforesaid proiect as completed on the date of this c€rtificate is given in Table A and B Below. TABLE A Buildingl wing/LayouUPlotted Development bearing Number Gut No.77P, OR Called PARVATI HILLS (To be prepared separately for each building/wing/layouUplotted development of the Real estate Proiect) Sr. No. Particulars Amounts (1) (2\ (3) 1 Total Estimated cost of the Rs. 14, 54, 12,1611 buildingMing/LayouVPlotted development as on date of Registration is 2 Cost lncurred as on date of certificate Rs. 1,62, 14,6851 3 Work done in Percentage 11.15o/o (as Percentage of the estimated cost) 4 Balance Cost to be lncurred Rs. 12,91,97,4761 (Based on Estimated Cost) 5 Cost lncuned on Additional / Extra ltems Rs.0.00 Not included in the Estimated Cost (Table-C I D. PAT STAI yo TABLE B lnternal & External Development works in respect of the registered phase Sr. No. Particulars Amounts (1) (2t (3) 1 Total Estimated cost of the lnternal and Rs.0.001 External Development Works including amenities and Facilities in layout as on date of Registration is 2 Cost lncuned as on date of certificate Rs.0.001 3 Work done in Percentage 0.00% (as Percentage of the estimated cost) 4 Balance Cost to be lncuned Rs.0.001 (Based on Eslimated Cost) 5 Cost lncurred on Additional / Extra ltems Rs.0.001 not included in the Estimated Cost (Tabte-C) Yours Faithfully, [S[-I D. PATFIRIfGr r'rtrc TRUCTURE,B.E, CIV STAT E/R12024/APL/1309" Akash D.Pathrikar Signature of Engineer (Lrcense No.. .......) Agreed and Accepted by Ptv{Tt coNsrRucflOlt tu --.G Signalure of promoter Proprielor l{ame: Kisan Khaderao Dhondare Date: 15/0112025 * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time as per specilicalions mentioned in agreement of sale. 2. (') Quantity survey can be done by office of Engineer or can be done by an independent euantity surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has lo be mentioned at the place marked (') and in case quantity are being calculated by office of Engineer, the name of the person in the ofiice of Engineer, who is responsible for the quantity catculated should be mentioned at lhe place marked (-). 3. Balance cost to be incurred (4) may vary from Difference between Total eslimated cost (1) and actual cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is estimaled cost ant deviation in quantity required fo[ developmenl in real estate project will result in amendment of the cost incuned/ to be incurred. 4. All components of work with specifications are indicattve and not exhaustive 5. Please specify ifthere are any deviation/qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra / Additional/ Deleted ltems Considered in Cost. (Which were not parts of the original Estimate of Total Cost) Sr.No List of Exka/Additional/ Deleted ltems Amount (ln Rs.) [iiSSH D. PATHRIIGR M . E,STRUCTURE, B. E. CIVIL S r N E / R/ 2024 tnp L7 i st io-