SARTHAK ASSOCIATES C7,PROZONE TRADE CENTRE, PROZONE MALL,AURANGABAD.431210. •ARCHITECTS. INTERIORS DESIGNERS VALUERS Annexure A Form 1 [See Regulatlon 3] ARCHITEC'S CERTIFICATE and Withdrawals of Money from (To be submitted at the Time of Registration of Ongoing Project Designated Account) Date: 08/04/2025 To, The Kisan Khanderao Dhondare, Gut No.77P, Villege-Golwadi, Nagar-ll, CIDCO, Waluj Mahanagar, Chhatrapati Sambhajinagar-431001. Work "PARVATI HILLS" having MahaRERA Sub:Certificate of Percentageof Completion of Construction registration) being developed by Registration Number P51500055239 (Only applicable after project Kisan Khanderao Dhondare. Sir, as Architect/ Licensed Surveyor of certifying ISantosh Mahadeo Sakhare have undertaken assignment HILLS" having MahaRERA Registration percentage of completion of construction Work of "PARVATI being developed by Kisan Khanderao Number P51500055239 (Only applicable after project registration) Dhondare. /wing of the aforesaid Real Estate Project. I Based on Inspection, with respect in layout/ each of building work done, for each of the building/wing certify that as on the date of this certificate, the percentage of of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work is detailed in Table B. executed with respect to each of the activity of the entire phase TABLE-A (Layout/ Building/Wing Number (To be prepared separately for each Layout/Building/Wing of the Project) Sr.No. Tasks/Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) (2) 1. Excavation 13.20% 2 Basement ( if any ) N.A 3. Podium (if any) N.A 4. Plinth 13.20% 5. Still Floor N.A 6. Slab of Super structure N.A 7. Internal wall internal plaster, Doors and windows with N.A Flats/ Premises 8. Sanitary Fittings with Flats/ Premises N.A 9. Staircase, Lift, Wells and Lobbies at each floor level N.A Overhead and underground Water Tanks. 10. External plumbing and external plaster, elevation, N.A completion of terraces with waterproofing of the Building/Wings. 11. Installation of Lifts, Water Pumps, Fire Fitting Fittings and NA. Equipment as per CFO NOC,Electrical Fitting, mechanical equipment, compliance tocondition of environment/CRZ NOC, Finishing to entrance lobby's, plinth protection. Paving of area appurtenant to Building/Wing. Compound Wall and all other requirement as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr.No. Common area of Facilities Proposed Percentage of Details Actual Work done (1) (2) (Yes/No) (5) (As on date of (3) certificate) (4) 1 Internal Roads and Footpath Yes 13.20% Concrete 2. Water Supply Yes 13.20% Borewel 3 Sewerage (Chamber Lines, Septic Yes 13.20% Yes Tank, STP. 4 Storm Water Drains N.A N.A. N.A 5. Landscaping & Tree Planting Yes 13.20% Garden 6. Street Lighting Yes 13.20% Along Road 7. Community Building N.A N.A. N.A. 8. Treatment and disposalof sewage N.A N.A N.A and sullage water. 9. Solid Waste Management & N.A N.A N.A Disposal 10. Water Conversion and rain water Upto Borewell 13.20% N.A harvesting N.A N.A N.A 11. Energy management N.A N.A 12, Fire protection and fire safety N.A requirement Meter 13.20% N.A 13. Electrical meter room, substation, receiving station. N.A N.A N.A 14. Other (Option to add more). MARE Yours Faithfuly, OSHSAKH CA2004/ Ar. Santosh Mahadeo Sakhare 34295 (License No.CA/2004/34295) RCHITES Agree and Accepted by, PARVATI CONSTRUCIIQN Signature of promoter Propretor Name: Kisan Khanderao Dhondare Date: 08/04/2025.