Annexure A FORIU 1 ISee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withclrawal of Money from Designated Account) Date:11-10-2024 To, SAI SHRADDHA BUILDCON, 02, NEAR JAIHIND PUBLIC SCHOOL, CAMBRIDGE JALNA ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of RANA PARK having MahaRERA Registration Number P51500055064 being devetoped by SAI SHRADDHA BUILDCON. (For Jul to Sep 2024 QPR) Sir, I / we MIRKUTE ARcHlrEcr AND INTERIOR DEStcNERS have underraken assignmenr as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of RANA PARK having MahaRERA Registration Number p51500055064 being devetoped by sAl SHRADDHA BUILDCON. Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Real Eslate Project, I certify that as on date of this certificate, the percentage of work Done for each of the Building/iving of the Real Estate Prolect under MahaRERA is aJ per Table-A herein below. The percentage of work executed with respecl to each of the activity of entire phase is detailed in Table-B. TABLE-A La Number FOR RANA PARK - Build A S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100% 2 X number o! Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 100% X rumber of Slabs of Super Struclure 100% 6 lnternal walls, lnternal Plaster, Floorings within Flats/premises, 100% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 4lYo the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 40% Staircases and Lifts, Overhead and Underqround Water Tanks. ffifr, E (.-il.ii:;,,) \IP,-K' 9 The external plumbing anO eitein-i piaster, elevition, comptetion 20% of lerraces with waterproofing of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas. electro, mechanical equipment, Compliance to conditions of environmenl /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to EuildingfuVing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TAB LE.A Number FOR RANA PARK - Build B S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 100% 5 X number of Slabs of Super Structure 100% 6 lnternal walls, Internal Plaster, Floorings within Flats/Premises, 100% Doors and Windows to each of the FlatiPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 40% the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 400/o Slaircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, completion of lerraces with waterproofing of the Building^/|/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fitlings and Oo/. Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compltance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA/Ving, Compound Wall and all other requiremenls as may be required to Obtain Occupation /Completion Certificate TABLE.B Areas (lnternal & Externa' Com mon Areas Works) FOR RANA PARK S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (21 (3) (4) (5) 1 lnternal Roads & Footpaths : YES 0% lnternal Project Roads ffiHS rQ#; :\^":rK9 Cement Roacl 2. Water Conservalion, Rain water YES 0% Rain water Harvesting as Harvesting: per Norms 3. Energy management : NO NA 4. Fire Protection And Fire Safety NO NA Requiremenls: 5. Electrical lvleter Room, Sub- NO NA Station, Receivinq Station : 6 Aggregate area of recreational YES 0% As sanction Plan Open Space : 7. Open Parking : NO NA 8. Water Supply : YES 0% From Bore-well 9. Sewerage (Chamber, Lines, Ytr5 20% Drainage Line Septic Tank , STP) : 10. Storm Water Drains : NO NA 11 Landscaping & Tree Planting : YES 0% Tree Plantation in Open Space 12. Street Lighting YES 0% lnternal Pro.iect Street Liqhts 13. Community Buildinqs NO NA 14. Others (Option to Add more) NO NA Yours faithfully, FOR MIRKUTE ARCHITECT AND INTERIOR DESIGNERS ARCH. SAURABH MIRKUTE Signature & Name (lN BLOCK LETTERS) / Architect License Number CA I 2017 186766 Agreed & Accepted by: /4@ ,bB- Signature of Promoter Name: DHA BUILDCON DaIe .'[1.10-2024 \-F' ! :! * fuo9'j