~, .",', ~ , .,' ,<"eo ':,i' ,c , " .~It;{",.. _>.~)<;j.',f;._IV~ MRNGGRL DeSIGN ARCHITECTS & INTERIOR DESIGNER Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from , Designated Account) Date: '"31 /01;./2.01-6 To, SHREE AMRUT SAl DEVELOPER PVT.L TD AURANGABAD, MAHARASHTRA, 431005 Subject: Certificate of percentage of Work of completion of construction work of GOLDEN HEIGHTS having MahaRERA Registration Number P51500055184 (Only Applicable after project Registartion) being developed by SHREE AMRUT SAl DEVELOPER PVT.L TD Sir, I/We MANGGAL DESIGN have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of GOLDEN HEIGHTS having MahaRERA Registration Number P51500055184 (Only Applicable after project Registration, being developed by SHREE AMRUT SAl DEVELOPER PVT.LTD) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below, The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A plaster, Floorings, Floors and windows within Page 1 of 3 ,.. --- --------- -------------------------------. I 10 I plaster, elevation, completion of terraces with 0.00 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as m be required to complete project as per specifications in agreement of other activities. , plaster, Floorings, Floors and windows within 0.00 10 I plaster, elevation, completion of terraces with 0.00 i 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per ;. 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. An other activities. Page 2 of 3 , }'. • 1 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase I Project Number) Yours Faithfully ~ MJ1~.§§fib ~ Ar.PramodVithoba Narale narcde.promod2Ml9moil.com <,.ARCH) CA/2011/S3a24 MANGGAL DESIGN Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CN2011/53824) Date of Certificate: Agreed and accepted by: ,.<7~ ~~ Signature of Promoter Page 3 of3