VAIBHAV BUDHWANT& ASSOCIATES Email: avesmartwayservices@gmail.com Mob No.: 8624855983 FORM 1 QUARTERLY PROGRESS REPORT (01.01.2024 TO 31.03.2024) See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 24/04/2024 To, The Sai Laxmi Buildcon, Add. Plot no. 16, Welcome Nagar, Garkheda, Chh. Sambhaji Nagar (Aurangabad) 431009 Subject: Certificate of percentage of completion of construction/development work of '18 LAXMI ELITES' 3BHK row house project. Having MAHA RERA registration number P51500055205 being developed by SAI LAXMI BUILDCON. Sir, I am Vaibhav Budhwant have undertaken assignment architect ofas certifying percentage of completion of constructions/development work of "18 LAXMI ELITES" 3BHK row house project having MAHARERA registration number PS1500055205 being developed by SAI LAXMI BULDCON. Based on site inspection, with respect layouteach building aforesaid Real Estate Project. I clarify that as on the date of this certificate, the percentage of work done for each of the building of the Real Estate project under building of the Real Estate Project under MAHA RERA is as per Table A heroin below. The percentages of the work executed with respect to the activity of the entire phase is detailed in the Table B. Page 1 of 6 Er. Vaibhav V. Budhwant REG. NO. DDMCB/R/2021/APU01132 Consulting Ciil Engineer Table A(BUILDING 'A") Sr.no Tasks/ Activity Percentages of actual work Done (As on details of the (1) (2) Certificate) 3) 1. Excavation 0% 2. Basement (if any) NA 3. Podiums (ifany) NA 4. Plinth 0% 5. Stiltfloor NA 6. Slab of super structure 0% 7. Internal wall, intemal plaster, îlooring, door and| 0% window within row houses 8. Sanitary fittings within the row house 0% 9. Staircase each floor level, overhead and 0% underground of the water tank. 10 External plumbing and extemal plaster, elevation,| 0% completion of terrace with waterproofing of the building. 11 Paving of areas, Compound Wall and all other 0% requirements as may be required to be complcte project as per specification in agreement of sale any other activities. Watbh Page 2 of 6 Er. Vaibhav V. Budhwant REG NO. DDMCB/RI2021/APLO132 Consulting Civil Engineer Table A (BUILDING 'B) Sr.no Tasks/ Activity Percentages of actual work Done (As on (1) (2) details of the Certificate ) (3) 1. Excavation 100% 2. Basement (if any) NA . Podiums(if any) NA 4 Plinth 100% 5. Stilt floor NA 6. Slab ofsuper structure 45% 7. Internal wall, internal plaster, flooring, door and 15% window within row houses 8. Sanitary fittings within the row house 0% 9. Staircase each floor level, overhead and 65% underground of the water tank. 0% 10 External plumbing and extemal plaster, elevation, completion of terrace with waterproofing of the| building. 5% 11 Paving of areas, Compound Wall and all other requirements as may be required to be complete project as per specification in agreement of sale any other activities. Page 3 of 6 Vci Er. Vaibhav V. Budhwant REG NO. DDMCB/R/2021/APLI01132 Consulting Civil Engineer TABLE 'B' (BUILDING "A) Common area (Internal and external development works) in respect of registration phase /project number. St.no Common areas and facilities Proposed Percentages of Details | (1) (2) (yes or no) actual work Done (5) (3) (As on date the certificate)(4) Internal roads&footpaths No NA Water supply (Borewell) Yes 0% Sewerage (Chamberlines, Septic Yes 0% Tank, Soak Pi) Storm water drains Yes 0% Tree Planting Yes 0% Treatment and disposal of Yes 0% sewage and sullage water Solid waste management& No NA disposal 8 Water conservation/Rain water Yes 0% harvesting Page 4 of 6 VAtha Er. Vaibhav V. Budhwant REG. NO. DDMCB/R/2021IAPU01132 Consulting Civil Engineer 9 No NA Energy management Electrical meter Yes 0% | 10 Main entrance gate Yes 0% 11 TABLE B (BUILDINC 'B') works) in respect of Common area (Internal and external development registration phase /project number. Percentages of Details Sr.no Common areas and facilities Proposed (yes or no) actual work Done (5) (1) (2) (3) (As on date the certificate) (4) Internal roads & footpaths No NA Water supply (Borewell) Yes 100% 2 Sewerage (Chamber lines, Yes 0% Septic Tank, Soak Pit) Storm water drains Yes 0% 4 Tree Planting Yes 0% 5 Treatment and disposal of Yes 0% sewage and sullage water Page 5 of 6 Vaha Er. Vaibhav V. Budhwant REG. NO. DDMC8/R/2021/APLI01132 Consulting Civil Engineer |7 Solid waste management& No NA disposal Water conservation/Rain water Yes 0% harvesting No NA 9 Energy management Electrical meter Yes 0% 10 Main entrance gate Yes 0% 11 Your faithfully, Name: Vaibhav Budhwant Er. Vaibhav V. Budhwant Signature: alheuw REG. NO. DDMCB/R/2021/APL/01132 Consulting Civil Engineer Licenseno: DDMCB/R/2021/APLU01132 Agreed and Acceptance Signature of Promoters Name: Mr. Ganesh Mohite gnus Date: 24/04/2024 VIbho Er. VaTbhav V. Budhwant REG. NO. DDMCB/R/2021/APU01132 Consulting Civil Engineer Page 6 of 6