Eng.Vaibhav Budhwant : 96573231 78 Eng. Rushikesh Bhokare :9881M8879 E-rnail : capitalcreative22 1 1 @gmail"com CAPITA Add. : G-24l25,SaiTrade Center,Near R.T.O., Railway Stattion Road, Aurangahad" for (To be submihed at the time of Registration of Ongoing Project and withdrawal of Money from Designated Account) Garkheda, Chh. Sambhaji Nagar (Aurangabad) 431009 subject: certificate of percentage of completion of constructiorvdevelopment MAHA work of '18 LAXMI ELITES' 3BHK row house project' Having RERA registration number being develoPed bY SAI LAXMI BUILDCON. Sir, I amVaibhav Budhwanthave undertaken assignment as architect of certifying percentage of completion of constructions/developmentwork of'18 LAXMI nurrlber ELITES'3BHK row house project having MAHARERA registration being developed by SAI LAXMI BUILDCON' Page 1 of 7 M/.S CAPTTAL CREAT|VE STUD|oS W PARTNERSHIP Based on site inspection, with respect layout leach building /wing aforesaid Real Estate Project I clarifu that as on the date of this certificate, the percentage of work done for each of the buildingof the Real Estate project under building of the Real Estate Project under MAHA RERA is as per Table A herein below. The percentages of the work executed with respect to the activity of the entire phase is detailed in the Table B. Table A (BUILDING 'A') Sr.no Tasks/ Activity Percentages ofactual work Done (As on details of the (r) (2) Certificate ) (3) l. Excavation 0% 2. Basement (if any) NA J. Podiums (if any) NA 4. Plinth 0% 5. Stilt floor NA 6. Slab of super structure 0% 7. Internal wall, intemal plaster, flooring, door and 0% window within row houses Page 2 of 7 ,,,ffi-dllal-C REATTVE b', i'OtCS ln;'it'- ,PARTNERSi.iIf 8. Sanitary fiuings within the row house 0% 9. Staircase each floor level, overhead and 0% underground of the water tank. 10 External plumbing and external plaster, elevation, 0% completion of terrace with waterproofing of the building. ll Paving of areas, Compound Wall and all other 0% requirements as may be required to be complete project as per specification in agreement of sale any other activities. Table A (BUILDING 'B') Sr.no Tasks/ Activity Percentages ofactual (1) (2) work Done (As on details of the Certificate ) (3) ' I Excavation t00% 2. Basement (if any) NA J. Podiums (if any) NA 4. Plinth 80% Page 3 of 7 M/S CAPITAL CREATIVE bTUOIOS w'hr- PARTNERSI.II') 5. Stilt floor NA 6. Slab of super structure 0% 7. Internal wall, internal plaster, flooring, door and 0% window within row houses 8. Sanitary fiuings within the row house 0% 9. Staircaseeach floor level, overhead and 0% underground of the water tank. 10 Extemal plumbing and external plaster, elevation, 0% completion of terrace with waterproofing of the building. 1t Paving of areas, Compound Wall and all other 0% requirements as may be required to be complete project as per specification in agreement of sale any other activities. Page 4 of 7 TABLE 'B', (BUILDING 'A',) Common area (Internal and extemal development works) in respect of registration phase /project number. Sr.no Common areas and facilities Proposed Percentages of Details (1) (2) (yesorno) actual work Done (5) (3) (As on date the certificate ) (4) I lnternal roads &footpaths No NA 2 Water supply (Borewell) Yes 0% J Sewerage (Chamber lines, Septic Yes 0o/o Tank, Soak Pit) 4 Storm water drains Yes 0% 5 Tree Planting Yes 0% 6 Treatment and disposal of Yes 0% sewage'and sullage water 7 Solid waste management No NA &disposal 8 Water conservation/Rain water Yes 0% harvesting Page 5 of 7 $qM*::,.:lu,o, .:{.€lr". '. PARTNERSHIP 9 Energy management No NA 10 Electrical meter Yes 0% 11 Main entrance gate Yes 0% TABLE'B' (BUILDING'B',) Common area (Internal and extemal development works) m respect of registration phase /project number. Sr.no Common areas and facilities Proposed Percentages of Details (1) (2) (yes or no) actual work Done (s) (3) (As on date the certificate ) (4) I lnternal roads &footpaths No NA 2 Water supply (Borewell) Yes 100% J Sewerage (Chamber lines, Yes 0% Septic Tank, Soak Pit) 4 Storm water drains Yes 0% 5 Tree Planting Yes 0% 6 Treatment and disposal of Yes 0% sewage and sullage water Page 5 of 7 STUDIOS PAR 7 Solid waste management & No NA disposal 8 Water conservation/Rain water Yes 0% harvesting 9 Energy management No NA 10 Electrical meter Yes 0% 11 Main entrance gate Yes 0% Your faithfully, Name :Vaibhav BudhwarJt 6'{ou^'<' Er. Vaibhav V. Budhwant Signature : REG. No. DDMcB/nlzoziniliorraz Consulting Civil Engineer r:^^-^^-^. p Drvt-1 SlRla-oa-r lqpLf ttU' Llcenseno' .:------- Agreed and Acceptance Signature of Promoters Name: Mr. Ganesh Mohite Datez20/1212023 ft'tlrl^"l ^ PageT of7