Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 30/06/2024 To, M/s. Aakash Ganga Developers, 102, Veer Shanti, Kranti Chowk, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of Project named as ‘Aakash Ganga’ – Phase II having Maharera registration no P51500054973 ,situated on Plot bearing Gut No.20, (P) Nakshatrawadi , Aurangabad being developed by M/s. Aakash Ganga Developers. Sir, I Satyam B Jadhav have assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Project named as ‘Aakash Ganga’ – Phase II having MahaRERA Registration No. P51500054973 being developed by M/s.Aakash Ganga Developers demarcated by its boundaries, Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Building – ‘Aakash Ganga’ – Phase II S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. 01 Number of Plinth 100% 5. 00 Number of Stilt Floor NA 6. 02 Number of Slabs of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, 75% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level 75% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 10% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings NA and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments , Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the ‘Aakash Ganga’ – Phase II (MahaRERA Registration No. P51500054973) S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / No) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths Yes 100% 2. Water Supply Yes 0% Through Borewell 3. Sewerage (Chamber, Lines, Yes 0% Through Septic Tank, STP) Septic Tank 4. Strom Water Drains No NA 5. Landscaping & Tree Planting Yes 0% Only Tree Plantation 6. Street Lighting Yes 0% Only on DP Road 7. Community Buildings No NA 8. Treatment & Disposal of Sewage No NA and Sullage Water 9. Solid Waste Management & No NA Disposal 10. Water Conservation / Rain Water No NA Harvesting 11. Energy Management No NA 12. Fire Protection & Fire Safety No NA requirements 13. Electrical Meter Room, Sub- No NA Station, Receiving Station 14. Others (Option to Add more) No NA Yours faithfully, Satyam B. Jadhav (Architect) License/Registration Number (CA/2020/118082) Address : 18, Jalna Road, Aurangabad. Agreed & Accepted by : Signature of Promoter - For & On behalf of M/s.Aakash Ganga Developers Name: Mr.Kiran Patil (Partner)