Arnexure - B FORU-2 [See Regulatioa 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Monev from Desigrrated Bank Account) AalP-: 02-01-2025 To, d-ioeaL INFRA BUILDERS AND DEvELoPERS, PLOT NO 322,BEEO BYPASS' BEHIND DATTATTIANDIR, AURANGABAD Subiect:certificateofcostlncurredforDevelopmentofSUNRISERES|DENGYhaving p515OOO552O7 developed by GLOBAL being MahaRERA n"gltrrtio" Number (For Oct loDec2024 Quarte0 INFRA BUILDEiS AND DEVELOPERS' Sir, 1. l/WeErADEELI$UQEEDsHAlKHhaveUndertakenassignmentofCertifying Registration Number MahaRERA Estimated Cost for SUNRISE RESIDENCY having P51500055207 being developed by GLOBAL INFRA BUILDERS AND DEVELOPERS 2. WehaveestimatedthecostofCivil,MEPandAlliedWorksrequiredforcompletionof of the Project as & extemal works the apartm'ents & proportionate completion of intemal Our estimated cost per the specifications mentioned in the Agreement of Sale calcu|ationsarebasedontheDrawings/PlansmadeavailabletousfortheProjectunder schedule of ltems & Quantity required Reference by the Devetopeo icon"Jtt"nt". The appointed by the for the entire work as calculated by Quantity Surveyor* Developer/Engineer, the asstrmption of the cost of material' labour & other inputs made ascertain / confirm the Uv in"'O*a"p"r, and the Site lnspection canied out by us to above analysis given to us. J- WeestimateTotalEstimatedCostofcompletionoftheaforesaidProjectmentioned underreferenceatRS.2,34,45,591/-(TotalofTableA&B)atthetimeofRegistration. to the civil, MEP & Allied works The estimated Totat cost oi eio;ea is with reference of intemal & external works' as completion of the apartments & proportionate complelion & for the purpose of obtaining per the specifications mentioned in ihe Agreement of Sale Jor the- Building(s) / wing{s) / Layout / occupation certificate / Gompletion certificate Plotted Development from in" cHrnrnRPATl SAMBHAJI NAGAR MUNIoIPAL CoRPoRATloNCHHATRAPAT|SAMBHAJ|NAGARbeingthePlanningAuthority is being implemented' under whose jurisdiction the aforesaid Project 4. The Estimated Cost incuned till date is calculates to Rs. 1,75,84,'t931 (Total of Table A& B). The Amount of E_s!.m.ded_.Q9.S! Inegrrg-d..iq..q?Igltleled.9n.!h.e_.b..?_s.!S.9-f.!npg!.m.d_e.Ii?.].S.1 servi@s used & unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specificalions mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 58,61 ,3981 (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & extemal works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABI,T-A Building I Wtne I I,ayolut / Plotted Development FOR SUNRISE RESIDENCY s. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Building / Wing / Layout / Rs. 2,20,33,2061 Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate Rs. 1,65,24,904/- 31 December 2024 J. Work Done in Percentage (as Percentage of 7 5o/o Estimated Cost) 4. Balance Cost to be incurred " ((based on Rs. 55,08,3021 Estimated Cost) 5. Cost'incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) TABLE- B Internal & External Development Works FOR SUNRISE RESIDENCY S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of lnternal & External Rs. 14,12,3851 Development Works including amenities & facilities in the Layout as on date of Reqistration is 2. Cost incurred as on date of Certificate Rs. 10,59,289 31 December 2024 -7EOl 3. Work Done in Percentage (as Percentage of Estimated Cost) 4. Balance Cost to be incurred " ((based on Rs. 3,53,0961 Estimated Cost) 5. Cost incuned on Additional / Extra ltems not included in the Estimated Cost (Table-C) Yours faithfully, B ADIL T,6q['EED SHAIKH B.E.-Civil, M.E. (Sti'ucture) AMi: Reg, No, S [\TE/R/2024/APV0996e l4o[i. No.8446048149 Er. ADEEL MUOEED SHAIKH Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number (if applicable) Agreed & Accepted by: I tnfn Bullders & Deveb9ers I Globd Signature of Promoter Name: GLOBAL INFRA BUILDERS AND DEVELOPERS Dale: 02-01-2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). J. (--) Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incuned / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TAALE- C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of t1:e original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1. 2.