A!.nexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale: O2-O1-2O25 To, GLOBAL INFRA BUILDERS AND DEVELOPERS, PLOT NO 322, BEED BYPASS, BEHIND DATTAMANDlR, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SUNRISE RESIDENCY having MahaREM Registration Number P51500055207bein9 developed by GLOBAL INFRA BUILDERS AND DEVELOPERS (For Oct to Dec 2024 Quarter) Sir, I / We Er ADEEL iIUQEED SHAIKH have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SUNRISE RESIDENCY having MahaRERA Registration Number Pst 500055207being devetoped by GLOBAL INFRA BUILDERS AND DEVELOPERS. Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildindMing of the Real Estate Project under MahaRERA is ai per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE.A / Winq Number FOR SUNRISE RESIDENCY s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) fi) (2) (3) 1 Excavation 100o/o 2 X number of Basement(s) and Plinth 1O0o/o 3 X number of Podiums 4 Stilt Floor lOOo/o 5 X number of Slabs of Super Structure lOOo/o 6 lntemal walls, lntemal Plaster, Floorings within 9jYo Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 90Yo Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 8Oo/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, 5Oo/o completion of tenaces with waterproofing of the BuildingM/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 50o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B Common Areas (lntemal & Extemal Works) FOR SUNRISE RESIOENCY S. Common Areas & Facilities Proposed Percentage Details No. (Yes / NO) of actual Work Done (As on date of Certificate) (1) (2) (3) (4) (s) 't_ lnternal Roads & Footpaths : NO NA 2. Water Conservation, Rain water YES 10o/o Rain Water Harvesting As Harvesting : Per Norms J. Enerqy manaoement : NO NA 4. Fire Protection And Fire Safety NO NA Requirements : 5. Electrical Meter Room, Sub- NO NA Station, Receivinq Station : t) Aggregate area of recreational NO NA Open Space . 7. Open Parkinq : NO NA 8. Water Supply : YES 3Oo/o From Bore-Well 9. Sewerage (Chamber, Lines, YES lOYo Drainage Line Till AMC Septic Tank , STP) : Line 10. Storm Water Drains : NO NA 11. Landscapinq & Tree Plantino : NO NA 12. Street Lighting : NO NA 13. Community Buildinqs : NO NA 14. Others (Option to Add more) NO NA Yours faithfully, B ADII MUQUEED SHAIKH n B.E.-Civil, M.E. (Structure) AMC Reg. No. SIArE 1N20241APV09969 ' '. ",./',t) ET. ADEEL MUQEED SHAIKH Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number ( ) o"t"l \ ll"ffI"l,?J;* u o.,"rop'o ,@E4op^etor, Signature of Promoter Name: GLOBAL INFRA BUILDERS AND DEVELOPERS Date: 02-01-2025