Annexure A DORU 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 09-10-2024 To, GLOBAL INFRA BUILDERS ANO DEVELOPERS, PLOT NO 322,BEEO BYPASS, BEHIND DATTA]TANDIR, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SUNRISE RESIDENCY having MahaRERA Registration Number P51500055207bein9 developed by GLOBAL INFRA BUILDERS AND DEVELOPERS. (For Jul to Sep 2024 Quarter) Sir, I / We Er ADEEL TUQEED SHAIKH have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SUNRISE RESIDENCY having MahaRERA Registration Number P5'1500055207bein9 developed by GLOBAL INFRA BUILDERS AND DEVELOPERS. Based on the Site lnspection, with respec{ to the Layout / each BuildingM/ing of the aforesaid Real Estate Projecl I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A I Number FOR SUNRISE RESIDENCY S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation lOOo/o 2 X number of Basement(s) and Plinth 1O0o/o 5 X number of Podiums 4 Stilt Floor 1O0o/o 5 X number of Slabs of Super Structure 100% b lntemal walls, lnternal Plaster, Floorings within 9Oo/o Flats/Premises, Doors and Wndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 90% Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 8Oo/o connecting Staircases and Lifts, Overhead and Underqround Water Tanks. I The external plumbing and external plaster, elevation, 5Oo/o completion of terraces with waterproofing of the BuildingM/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 5Oo/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requarements as may be required to Obtain Occupation /Completion Certificate TABLE.B Common Areas (lnternal & Extemal W TKS) FOR SUNRISE RESIDENCY s. Common Areas & Facilities Proposed Percentage Details No. (Yes / NO) of actual Work Done (As on date of Certificate) (1) (21 (3) (4) (s) 1 lnternal Roads & Footpaths : NO NA 2. Water Conservation, Rain water YES Oo/o Rain Water Harvesting As Harvesting . Per Norms 3. Enerqv manaqement : NO NA 4. Fire Protection And Fire Safety NO NA Requirements : 5. Electrical Meter Room, SUb.' NO NA Station, Receivinq Station : o. Aggregate area of recreational NO NA Open Space : 7. Open Parkinq : NO NA 8. Water Supplv : YES 20o/o From Bore-Well v. Sewerage (Chamber, Lines, YES Oo/o Drainage Line Till AMC Septic Tank , STP) : Line 10. Storm Water Drains : NO NA 11 Landscapinq & Tree Plantinq : NO NA 12. Street Lightinq : NO NA 13. Community Buildinqs : NO NA 14. Others (Option to Add more) NO NA Yoursraith,ry, g;:.ffi|,[l AMI Res No' SIATE/R/2024/APU09969 Mob' No' 8446048149 Er. ADEEL tIUQEED SHAIKH Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect LicenseNumber ( ) Agreed & Accepted by: I GbDd Infn iltoen r Devtloplrs I . @_"rioprr*o, , ) Promoter Signature of Name: GLOBAL INFRA BUILDERS AND DEVELOPERS Date. 10-07-2024