Annexure A FOR}I 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at tle time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:10-07-2024 To, GLOBAL INFR,A BUILDERS AND DEVELOPERS, PLOT NO 322,BEED BYPASS, BEHIND OATTA]SANDIR, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SUNRISE RESIDENCY having MahaRERA Registration Number P51500055207being developed by GLOBAL INFRA BUILDERS AND DEVELOPERS. (For Apr to Jun 2024 Quarter) Sir, I / We Er ADEEL ISUQEED SHAIKH have underlaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SUNRISE . RESIDENCY having MahaRERA Registration Number P5l500055207being devetoped by GLOBAL INFRA BUILDERS AND OEVELOPERS. Based on the Site lnspeclion, with respect to the Layout / each Buildingruing of the aforesaid Real Estate Project, l.certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Buildi Number FOR SUNRISE RESIDENCY S. Tasks / Activity Percentage of Actual Work No. Done (As on datc of the Certificate) fl) l2t (3) 1 Excavation lOOo/o 2 X number of Basement(s) and Plinth 100Yo X number of Podiums 4 Stilt Floor 100% X number of Slabs of Super Structure 9Oo/o o lntemal walls, lnternal Plaster, Floorings within 600/o Flats/Premises, Doors and Windors to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 600/0 Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 5Oo/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, 300h completion of terraces with waterproofing of the BuildingAA/ing '10 lnstallation of lifts, water pumps, Fire Fighting Fiftings 10o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (lnternal & External Works) FOR SUNRISE RESIDENCY s. Common Areas & Facilities Proposed Percentage Details No. (Yes / NO) of actual Work Done (As on date of Certificatel (1) tzt (s) (4) (s) 1. lnternal Roads & Footpaths : NO NA 2. Water Conservation, Rain water YES Oo/o Rain Water Harvesting As Harvesting . Per Norms 3 Energy manaqement : NO NA 4. Fire Protection And Fire Safety NO NA Requirements : q Electrical Meter Room, Sub- NO NA Station, Receivinq Station : b. Aggregate area of recreational NO NA Open Space : 7. Open Parking : NO NA 8 Water Supply : YES 15o/o From Bore-Well 9. Sewerage (Chamber, Lines, YES Oo/o Drainage Line Till AMC Septic Tank , STP) : Line 10. Storm Water Drains : NO NA 't1. Landscapinq & Tree Plantinq : NO NA 12. Street Lighting : NO NA 13. Community Buildinqs : NO NA 14. Others (Option to Add more) NO NA Yoursraithrury, B.E.-Civil, ^*'M,:*:,Il M.E. (Structure) AMC Req No STAIE/R/2024/APV09969 Mob. No' 8446048149 ET. ADEEL TUIUQEED SHAIKH Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number ( ) Agreed & Accepted by: Globd Infn lullders & Developers .@% -4 , t,roprlctor .' Signature ofPromoter ) Name: GLOBAL INFRA BUILDERS AND DEVELOPERS Dale:10-07-2024