Annexure - B FORM - 2 ISee Regulation 3I ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Bank Account) Date: 25_10_2023 To, NARAYANII BUILDCREATION PVT. LTO. BAHETI COMPLEX, KELI BAZAR, AURANGABAD 431001 Subject: certificate of cost rncurred for Deveropment of HR|M sKy crw ELrrE having MahaRERA Registration.Number NEW REGISTRATIONbeing devetoped by NARAyANI BUTLDCREATTON pVT. LTD. Sir, 1. I / We A.M. JADHAV have undertaken assignment of Certifying Estimated Cost for HRIM SKY C|TY ELTTE having MahaRERA Registration Number NEW REGISTRATION being devetoped by NARAYANI BUTLDCREATTON pVT. LTD. 2. we have estimated the cost of civir, MEp and Aflied works required for compretion of the apartments & proportionate compretion of internar & extemar works of the project as per the specifications mentioned in the Agreement of sale. our estimated cost calculations are based on the Drawings/prans made avairabre to us for the project under Reference by the Developers / consultants. The schedule of ltems & Quantity required for the entire work as calculated by euantity Surveyor* appointed by th; Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. we estimate Total Estimated cost of compretion of the aforesaid project mentioned under reference at Rs. 9,74,01,105f (Total of Table A & B) at the time of Registration. The estimated rotar cost of project is with reference to the civir, MEp & Allied works completion of the apartments & proportionate compretion of internar & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / wing(s) / Layout / plotted Devetopment from the CHHATRAPATT SAMBHAJI NAGAR MUNICIPAL CORPORATION CHHATRAPATI SAMBHAJI NAGAR being the Pranning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost incurred til date is calcurates to Rs.1,91,05 221t-(rotar of rabre A & B). The Amount of Eslimatp..q..gqst..!nssr.r.ed..i!..sg.|9ulatp..d .9..n .th.e...b..?.9i.q...o.L.inp.ut m.?.teiale. l.eeryices.ueeq. g.qni!.cast. aL th.ege.items. 5. The Balance cost of compretion of the civir, MEp & Aflied works for compretion of Apartments & proportionate completion of internal & e)dernal works, as per specifications mentioned in Agreement of sale, of the aforesaid project is estimated at Rs.7,82,95,8841 (Totat of Table A & B). 6. I certify that the cost of civir, MEp & A ied work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of sare, of the aforesaid Project as comprered on the date of this certificate is as given in TableA&Bbelow: TABLE - A FOR THE ROW HOUSES NO 1 TO 44 AND 57 TO 61 S. Particu la rs Amount (in Rs.) No. 1. Total Estimated Cost of AuitAing I Wingl LayouV Rs.8,84,0'1,105/- Plotted Development as on date of Reqistraiion is 2. Cost incurred as on Oate ot Certiticate Rs. 1,76,80,221l- J. Work Done in Percentage lasFercentageii 20% Estimated Cost) 4. Balance Cost to be incurred '. (based on Rs.7,07,20,8841 Estimated Cost) Cost incurred on AEOitional I Ertra lterns not included in the Estimated Cost (Table-C) TABLE - B Intemal & Extemal Development Works FOR THE ROW HOUSES NO 1 TO 44 ANO 57 TO 51 S. Particu lars Amount (in Rs.) No. 1. Total Estimated Cost ot lnternal a Extemal Rs.9000000/- Development Works including amenities & facilities in the Layout as on date of Registration ls 2. cost incurred as on date of certmiite .- - 1425000t- 3. Work Done in Percentage @iFercentage of 160k Estimated Cost) 4. Balance Cost to be incured * ((based on Rs.7575000/- Estimated Cost) ( Cost incurred on AdOitionat I Extra lterns not Rs. included in the Estimated Cost (Table-C) Yours faithfrllv. } F:;M. JI\DHAV Be. Civil Govt. Contractor Signature & [ame with Stamp of Engineer ER. A.M, JADHAV Local Authority License Number (_ Agreed & Accepted by: Name: NARAYANtt BUTLDCREATTON pVT. LTD. Date: 25-10-2023 Note: 1 ' The scope of work is to comprete Registered Rear Estate project as per drawings approved from time to time as per specifications mentioned in the Agieementio Sale. 2 (.) Quantity survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who,s Certificate of euantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (,) I in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsibre for the quantity carcurated shourd be mentioned at the place marked (*). ('.) Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Deveropment of Rear Estate project wirr resurt in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive Please specify if there are any devialions / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra I AAaitional TOeleted tterns Amount (in Rs.) 1. "r