Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 16/04/2026 To, M/s. SAMARTH INFRA, B-402,Hererama Harekrishna Socity, Chikalthana MIDC, Aurangabad. Subject : Certificate of percentage of Work of completion of construction work of SHIVSAMARTH RESIDENCY having MahaRERA Registration Number P51500052807 being developed by M/s. SAMARTH INFRA Sir, I/We Er. MILIND WADEKAR have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of SHIVSAMARTH RESIDENCY having MahaRERA Registration Number P51500052807, being developed by M/s. SAMARTH INFRA ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A (JAN TO MARCH 2026) Layout/Building/Wing Number: A 73 TO A 90 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 100.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. Page 1 of 7 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 95.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 91 TO A 99 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 100.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 100.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 55 TO A 72 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 100.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 100.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 7 Layout/Building/Wing Number: B 01 TO B 07 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 100.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 100.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 37 TO A 54 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 50.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 100 TO A 117 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) Page 3 of 7 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 50.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 19 TO A 36 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 50.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 118 TO A 135 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Page 4 of 7 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 01 TO A 18 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A 136 TO A 150 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 0 Basements (if any) 3 Podiums (if any) 4 1 Plinth, 100.00 5 Stilt Floor 6 2 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. Page 5 of 7 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A1 BUILDING Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 20.00 2 0 Basements (if any) 3 Podiums (if any) 4 Plinth, 0.00 5 Stilt Floor 6 7 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: A2 BUILDING Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 20.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 0.00 5 Stilt Floor 6 7 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 6 of 7 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) (JAN TO MARCH 2026) Sr.No Common areas and facilities Proposed Percentage of Details (Yes / No) Actual Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 70.00 As per drawings by Consultants 2 Water Supply Yes 30.00 As per drawings by Consultants 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 30.00 As per drawings by Consultants 4 Storm Water Drains No ----- 5 Landscaping & Tree Planting Yes 30.00 As per drawings by Consultants 6 Street Lighting Yes 0.00 As per drawings by Consultants 7 Community Buildings No ----- 8 Treatment And Disposal Of Sewage And Sullage Water Yes 30.00 As per drawings by Consultants 9 Solid Waste Management And Disposal No ----- 10 Water conservation /Rain water harvesting Yes 10.00 As per drawings by Consultants 11 Energy managemcnt No ----- 12 Fire protection and fire safety requirements No ----- 13 Electrical meter room, sub-station, receiving station Yes 0.00 As per drawings by Consultants 14 Aggregate area of recreational Open Space Yes 30.00 As per drawings by Consultants 15 Open Parking No ----- 16 Others. Compound wall & Entrance Gate Yes 0.00 As per drawings by Consultants Yours Faithfully Er. MILIND WADEKAR Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: MCB/R/2019/APL/00260) Date of Certificate: Agreed and accepted by: Signature of Promoter Name : M/s. SAMARTH INFRA Date : Page 7 of 7