Amol Kshirsagar Architectural Planner, Annexure - B Consulting Engineer & Valuer FORM - 2 [See Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Proiect and for Withdrawal of Money from Designated Bank Account) oate: 19/ot/2025 To, The Jagrutsara Realtors LLP, Block No.11, Naraya n Plaza, Towen Center, CIDCO CannauBht Place. Chhatrapati Sambhajinagar Subject:Certificate of Cost lncurred for Development of "signature 27" having MahaRERA Registration Number P51500054759 being Developed by Jagrutsara Realtors LLp. Sir, L. I / We Er. Amol Kshirsagar have undertaken assignment of Certifying Estimated Cost for "Signature 27" having MahaRERA Registration Number P51500054759 being Oeveloped byJagrutsara Realtors LLP. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Pla ns made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Er. Amol Kshirsagar uantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, r & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under refe at Rs. 6,34,44,880/- (Total ofTable A & B) at the time of Registration. The estimated Total Cost is with reference to the Civil, MEP & Allied Works completion of the apartments & pro completion of internal & external works, as per the specifications mentioned in the Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Build Development from the chhtrapati Sambhajinagar Municipal Corporation chhatrapati Sa mbhajinagar ing the Planning Authority under whose jurisdiction the aforesaid Project is bein8 implemented. 4. The incurred till date is calculates to Rs. 3,40,75,290/- (Total of Table A & B). The Amount of Estimate Flat No.{hf [g&UAr,l[h",,. Nath praii!iiii,GaikhdA;; Chhatrapati Sambhajinagar Mob. : 09960669921 "' ,N) 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 2,93,69,590/- (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABTE - A Project Signature 27, Block A and Block B Row Houses/Row Bungalows S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing / Layout / Rs.5,78,00,850/- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate 3L/L212O24 Rs. 32946484/- 3. Work Done in Percentage (as Percentage of Estimated s7% cost) 4. Balance Cost to be incurred ** ((based on Estimated Rs. 24854366/- cost) 5. Cost incurred on Additional/ Extra ltems not included in the Estimated Cost (Table-C) TABTE -B lnternal & External Development Works in respect of Registered Phase S. No, Particulars Amount (in Rs.l 7. Total Estimated Cost of lnternal & External Rs.56,44,030=00 Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate 3L/LZ/2O24 Rs.11,28,806=00 3. Work Done in Percentage (as Percentage of Estimated LOv cost) 4. Balance Cost to be incurred ++ ((based on Estimated Rs.45,15,224=00 cost) 5. Cost incurred on Additional/ Extra ltems not included in the Estimated Cost (Table-Cl Yours faithfully, e.Tq {l sIATE/Ri2o23ll> *\ epLioaroz /3 Signature & Name Er. Amol Kshirsagar with Stamp of Engineer A;n-g [Not less thon Bochelor's Degree Holder or equivolent os per Section 2(u) of the Act] Local Authority License Number (if applicable) Signature-of f fomoter m w Date:79/OL/2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (+) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (* ). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated cost any deviation quantity required for the Development of Real Estate Proiect will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of 5ale. TAELE - C List of Extra / Additional / Deleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1. .r \r T,\ 2. \-- Bt07 li! @