Amol Kshirsagar An:hrtt;ctL.lral Pl.innet Consulling Errrjjneer & Valuer Annerure - B FORM - 2 [See Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Datet74lO4l2O24 To, The Jagrutsara Realtors LLP, Block No,11, Narayan Plaza, Towen Center, CIDCO Cannaught Place, Chhatrapati Sambhajinagar Subject:Certificate of Cost lncurred for Development of "Signature 27" having MahaRERA Retistration Number P51500054759 being Developed by Jagrutsara Realtors LLP. Sir, 1. l/We Er. Amol Kshirsagar have undertaken assignment ofCertifying Estimated Cost for'Signature 27" having MahaRERA Registration Number P51500054759 being Developed by Jagrutsara Realtors LLP. 2. We have estimated the cost of Civil, MEP and Allied Work required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants, The Schedule of ltems & quantity required for the entire work as calculated by Er, Amol Kshirsagar Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. i 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 6,34,44,880/- (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) Flat No.4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Sambhaji Naqar,9960669921 ^ls €Amol I ff,:,TjlPf,g,r' C"orxulling Engineer d oevelopment from the chhtrapati sambhajinagar Municipar corporation chhatrapati sambhajinagar being the Planning Authority under whose ju risd iction the aforesaid project is being impremented. 4 The Estimated cost incurred ti[ date is carcurates to Rs. 69,08,891/- (Totar of rabre A & B). The Amount of .Es.tim.a.ted.-c.-o.tt !n gurr.e.C. !.s. gatqJrla!.e p gt. d.9n.th 9.-b.+ iF.pf. !n m etsrj.a!p.l.q gr:{ie.e..s.v.g ed.&.._un!!.,c,erl .sf. t h.e.se .lte.m.s. 5 The Balance cost of compretion of the civir, MEp & A ied works for compretion of Apartments & proportionate compretion of internar & externar per works, as specifications mentioned in Agreement of Sale, of t he aforesaid project is estim ated at Rs. 5,65,3 5,989/_ (Total ofTableA&B). 6 r certify that the cost of civir, MEp & A[ied work for apartments & proportionate internar & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid project as completed on the date of this certificate is as given in Table A & B below: TABIf - A Project Signature 27, Block A and Block B Row Houses/Row Bunglows Total Estimated Cost of Building / Win g Layout / Plotted Development as on date of Registration is / Cost incurred as on date of Certificate Work Done in Percentage (as percentage of Estimated Balance Cost to be incurred ** ((bared on-stimiGl' Cost incurred on Additional/ Extra ltems not included h the Estimated Cost lnternal & External Development Works in respect of Registered phase Total Estimated Cost of lnternal & External Development Works including amenities & facilities in the Layout as on date of Resistration is Cost incurred as on date of Certificate Work Done in Percentage (as eercentage of Estirnated Flat No. 4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Sambhaji Nagar, 99606G9921 Al: K9 Amol T [,:J"li::ggy Etrs':t ttx:r & I l,.:;;"ri""", 4. Balance Cost to be incurred ** ((based on Estimated Rs.45,15,224=00 5. Cost incurred on Additional/ Extra ltems not included in fo**"]\ r,\ IEtT+13 Yours faithfully, $v\ e.r. tCail) ln * \,1.urer,Ja5sdr Signature & Name Er. iil-^cr""i.* r,/ ./ -;-1,.f .1_ INot less thon Bqchelo/s Holder or Section 2(u) ol the Actl Local Authority License Number (if applicable) Agreed & Accepted by: Signature of Pronldter Name: Jagrutsara Realtors LLP OatetT4/o4/2024 Note: 1. The scope of work is to complete Registered Real Estate project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (+). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. Flat No.4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Sambhaji Nagar, 9960669921 @amor Ksnlrsagar Architeclural Plariner, Consrrlling [:nqtrter;r & )lr,J- 4. All components of work with specifications a re ind icative & not exha ustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABI-E - C [ist of Extra / Additional / Deleted ltems considered in the Cost (Which were not parts ofthe original Estimate ofTotal Cost) - S. No. List of Extra / Additional / Deleted ttems AmountJin Rs.) 1.