Amol Kshirsagar Architectural Planner, Consulting Engineer & Valuer Annexure A FORM 1 [See Regulation 3] ARCHITECTS CERTI FICATE (To be submitted at the time of Retistration of ongoing Project & for withdrawal of Money from Designated Account) oate:l4l04/2024 To, The Jagrutsara Realtors LLP, Block No.11, Narayan Plaza, Towen Center, CIDCO cannaught Place. chhatrapati sambhajinagar su bject: certificate of Perce ntage of com pletion of con struction work of 'Signatu re 27" having MahaRERA Registration Number P51500054759 being Developed by Jagrutsara Realtors LLP. Sir, I Arch/Engg. Amol Kshirsagar we have undertaken assignment as Architect / Licensed surveyor ot certifying Percentage of completion of construction work of "signaturc 27" having MahaREM Registration Number P51500054759 being Dev'eloped by Jagrutsara Realtors LLP' Based on the site lnspection, with respect to the Layout / each Building/wing of the aforesaid Real Estate project, I certify that as on date of this certificate, the Percentage of work Done for each of the Building/wing of the Real Estate Project under MahaREM is as per Table-A and A-1 herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE.A Block A Row House/Row Bunglows Project Sitnature 27 Sr.No, Tasks / Activity Percentage of Work L Excavation 100 2 X number of Basement(s) and Plinth 30 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises Flat No. 4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Amol Kshirsagar I Architt.tctural Plarrner, Consultirrg Fnqineer & Val"rer I 7 Sanitary Fittings within the Flat/Premises,Electrical Fittings 0 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Buildine/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO Noc, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to obtain occupation /Completion Certificate TABLE.A.1 Block A Row House/Row Bunglows Project signature 27 Sr.No. Tasks / Activity Percentace of Work 1, Excavation 0 2 X number of Basement(s) and Plinth 100 3 X number of Pod iums 30 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premis€s 7 Sanitary Fittings within the Flat/Premises,Eledrical Fittings 0 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building,/Wing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 0 Equipment as per CFO NOC, Electrical fittings to Common Flat No.4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Sambhaji Nagar,9960669921 qa Amol Kshirsagar Arciritectural Pl:urner. Consrrlling Engineer & Areas, electro, mechanical equipment, compliance to conditions of environment /cRz Noc, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B common Areas (lnternal & External Development Works) in respect of the Registered Phase,/ Project Number S. No. Common Areas & Facilities Proposed Percentage Details (Yes / No) of actual Work Done (As on date of Certificate) (1) (2) (3) (4) (s) 1. lnternal Roads & Footpaths YES 20"/. lnternal Project cement Roads 2. Water Supplv YES 30% From Borewell 3. Sewerage (Chamber, l-ines, Septic YES 00 Drainage Line Tank, STP) 4. Strom Water Drains NO NA 5. Landscaping & Tree Planting YES 200/0 Tree Plantation in Open Space 6. Street Lishtinc YES ooo/. lnternal Proiect Street Lights 7. community Buildings NO NA 8. Treatment & Disposal of sewage NO NA and Sullage Water Solid Waste Management & NO NA Disposal 10. water Conservation / Rain Water YES 00% As per Norms Harvestins 11. EnerBy Management NO NA 72. Fire Protection & tire safety NO NA requirements 13. Electrical Meter Room, Sub- NO NA Station, Receiving Station 74. Others (Option to Add more) Yours faithfully, Flat No. 4, Plot No.102, Nathprangan, Garkheda, r,9960669921 Amol Kshirsagar Architectural Pl;.irtner. Consulting Enrjineer & VaLer Signature & Name Er. Amol / Architect License Number Agreed & Accepted by: Name: Jagrutsara Realtors LLP Oate: L4lMl2O24 Flat No.4, Plot No.102, Nathprangan, Garkheda, Chhatrapati Sambhaji Nagar,9960669921