Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 08-04-2026 To, PARAM CASA DEVELOPERS, PLOT NO 6, LILASONS CHARITABLE TRUST BUILDING, RAILWAY STATION ROAD, NEAR RTO BUILDING, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of PARAM CASA ROYAL having MahaRERA Registration Number P51500054904 being developed by PARAM CASA DEVELOPERS. (For JAN to MAR 2026 QTR) Sir, I / We SPACE ARCHITECTS INTERIOR DESIGNERS has undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of PARAM CASA ROYAL having MahaRERA Registration Number P51500054904 being developed by PARAM CASA DEVELOPERS. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number FOR PARAM CASA ROYAL S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums ------ 4 Stilt Floor 100% 5 X number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 100% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 90% the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, completion of 96% terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and 98% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal & External Development Works) FOR PARAM CASA ROYAL S. No. Common Areas & Facilities Proposed Percentage of Details (Yes / NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths : NO ----- NA 2. Water Conservation, Rain water YES 80% Rain water Harvesting as Harvesting : per Norms 3. Energy management : NO ----- NA 4. Fire Protection And Fire Safety NO ----- NA Requirements : 5. Electrical Meter Room, Sub-Station, NO ----- NA Receiving Station : 6. Aggregate area of recreational Open NO ----- NA Space : 7. Open Parking : NO ----- NA 8. Water Supply : YES 90% From Bore-well 9. Sewerage (Chamber, Lines, Septic YES 80% Drainage Line till Tank , STP) : Corporation Line 10. Storm Water Drains : NO ----- NA 11. Landscaping & Tree Planting : NO ----- NA 12. Street Lighting : NO ----- NA 13. Community Buildings : NO ----- NA 14. Others (Option to Add more) NO ----- NA Yours faithfully, FOR SPACE ARCHITECTS INTERIOR DESIGNERS ARCH. GANESH MHAROLKAR Signature & Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number CA / 2001 / 27254 Agreed & Accepted by: Signature of Promoter Name: PARAM CASA DEVELOPERS Date: 08-04-2026