Er Shahrukh Shah Annexure - B FORM - 2 [See Regulatlon 3] t'NGINEER'S CERTIFICATE (To be submitted at thc time ol Regrstration of Ongoing Project and for Withdrawal of Moncy from Designated Bank Account) Dale.10-04-2024 To. PARAM CASA DEVELOPERS, PLOT NO 6, LILASONS CHARITABLE TRUST BUILDING, RAILWAY STATION ROAD, NEAR RTO BUILDING, AURANGABAD Subject: Certificate of Cost lncurred for Development of PARAM CASA ROYAL having MahaRERA Registration Number P51500054904 being developed by PARAM CASA DEVELOPERS (For Jan to Mar 2024 QTR) Sir, 1 | / We Er Shahrukh Shah has undertaken assignment of Certifying Estimated Cost for PARAM CASA ROYAL having MahaREM Registration Number P51500054904 being developed by PARAM CASA DEVELOPERS 2 We have estimated the cost of Civil, MEP and Allied Works required for completion of ihe apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawtngs/Plans made available to us for the Project under Reference by the Developers / consultants. The schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyor* appointed by the Devetoper/Eng ineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carrled out by us to ascertain / confirm the above analysis given to us. J. we estimate Total Estimated cost of completion of the aforesaid Project mentioned under reference at Rs. 6,64,19,780^ (Total of Table A& B) at the time of Registration The estimated Total cost of Project is with reference to the civil, MEP & Allied works completion of the apartments & proportionate completion of internal & externai works, as per the specifications mentioned in the Agreement of sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the CSNMC - CHHATRAPATI SAMBHAJI NAGAR MUNICIPAL CORPORATION CHHATRAPATI SAMBHAJI NAGAR being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. Er Shahrukh Shah 4 The Estimated Cost incurred till date is calculates to Rs. 3,19,70,7151 (Total of Table A& B) TheAmountof Estimale.d.Q..ast.[nqurr.ed.ie.calg.ula.led.9]l..th.e.haSis.qf.lnp..!'!..meterials.l s9[yi.qes. u9ed .&. u.ni! soJ!.qJ.these. items 5 The Balance Cost of completion of the Cival. MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs 3,44,49,065/- (Total of Table A & B) 6. I Certify that the cost of civil. MEP & Allied work for apartments & proportionate internal & external works, as per the speciflcations mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below. TABLE - A ISuilding I Wing I Layout FOR PARAM CASA ROYAL S. Particulars Amount (in Rs.) No. 1 Total Estimated Cost of Building / Wing / Layout / Rs 6,39,41,4301 Plotted Development as on date of Registration is Cost incurred as on date of Certificate Rs 3,19,70,7151 31 March 2024 3. Work Done in Percentage (as Percentage of 500/o Estimated Cost) 4. Balance Cost to be incurred "* ((based on Rs 3,19,70,7151 Estimated Cost) 5. Cost incurred on Additional / Extra ltems not included in the Estimated Cost (l-eqle-C) TABLE - B Intcrnal &, I'lxtcrnal Development Works FOR PARAM CASA ROYAL S. Particulars Amount (in Rs.) No. 1 Total Estimated Cost of lnternal & External Rs 24,78,350^ Development Works including amenities & facilities in the Lavout as on date of Reqistration is 2. Cost incurred as on date of Certificate Rs N ll/- 31 March 2024 3. Work Done in Percentage (as Percentage of 0% Estimated Cost) 4. -- Balance Cost to be incurred ((based on Rs. 24,78,3501 Estimated Cost) Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Er Shahrukh Shah Yours faithfully, FOR Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number (if applicable) $ID =la (") Name:PARAM CASA DEVELOPERS Date:10-04-2024 Note: 1. The scope of work is to complete Registered Real Estate Project as per diawings to approved from time to time as per specifications mentioned in the Agreement Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independentQuantitySurveyor,who,sCertificateofQuantityCalculated,canbe appointed relied up on by Engineer. ln case of independent quantity surveyor being by Developer, the name has to be mentioned at the place marked (-) & in case quantity are belng calculated by office of Engineer, the name of person in the office at of Engineer, who is responsible for the quantity calculated should be mentioned the place marked (.). 3. (-") Balance Cost to be incurred (4) may vary from difference between Total EStimatedCost(1)&actualCostincUrred(2)duetodeviationinquantityrequired/ quantity required escalation of cost etc. As this is an Estimated cost any deviation fortheDevelopmentofRealEstateProlectwi||resultinanamendmentofthecost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive Er Shahrukh Shah 5. Please specify if there are any deviations i qualifications. Example. Any deviation input material used from specifications in Agreement of Sale. TABLE - C List ol Extra / Additional / Delcted ltcrns considered in the Cost (Which wcrc not parts of the originiil tistimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems