FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate ) (To be submitted at the end of Financial Year) Date: To. The Rupesh Prakashchand Mutha Aurangabad (M Corp.), Aurangabad, Aurangabad, 431007 Quality Assurance Certificate (Certificate No. .for the Year Ending Subiect: Certificate for guality of materials Used and guality of Construction and workmanship of the work of 55 HAPPYNEST having MahaRERARegistration Number P51500052128 being developed by Rupesh Prakashchanci Mutha Sir, I/We have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes BY STRUCTURAL TEAM conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for Yes Name: NIRANJAN MULEY |the project? |License No: STATE/RI2025/APL/16697 Mobile: 9960869474 E-mail: muley.niranjan@gmai.com 3 Whether the inspection registers, site order book Yes |AS PER GUIDELINES and quality control test registers are maintained at the site properly and endorsed by the Engineer-in Charge? 4 Whether testing facilities to check quality of material No is available at site? Page 1 of3 Sr. No. Parameters Yes/No Remarks 5 |Whether the statuary provisions for disaster Yes AS PER RCC ENGINEER DRAWINGS |resistancelearthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated Yes AS PER GUIDELINES |flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Pametens 1 |Whether the following building materials confirm to Yes relevant IS/BS/NBC Čode, or as per Industry |Standards? If yes, provide details: a) Cement, concete and coarse aggregate Yes AS PER SUPPLIER ETAHS (b) Steel and its alloys Yes AS PER SUPPLIERDETAILS (c) Electrical wire,fittings and accessories Yes AS PER SUPPLIER DETAILS (d) Píumbing andsanitary fittings Yes AS PER SUPPLIER DETAILS 2 Whether regular tests of materials and construction No products are being done from accredited labs also? |f ves, details af such labs 3 |Whether manufacturer test certificate for cement, Yes AS PER SUPPLIER DETAILS steel, pipes etc. have been obtained and whether supply records are being maintained? Whether suitable water is being used for Yes construction? () What is the source of water? Yes FROMGROUND WATER TABLE () Has water been tested and approved by Yes AS PER GUIDELINES Engineer-in-Charge before construction? (üi) Has water been tested subsequently as per Yes NO TESTING DONE AS IT IS GROUNDO requirenment? WATER 3. Quality of Workmanship Sr. No. Parameters YesNo Remarks 1 Whether works of all the electrical Yes |AS PER GUIDELINES wiring/connections/lift installation/other electrical |installations have been carried out under lauthorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes AS PER GUIDELINES |including installation of water supply systems, saitage systas, sAwaJE systas, siTks, taitas etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been 3 Whether all the work is being carried out under Yes |INCONTRACTOR'S SCOPE supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of 3 Sr. Na. Paraneters Yes/No Resnass 4 Whether remedial measures are undertaken to Yes AS PER GUIDELINES prevent dampness and leakages? If yes, provide details 5 Whether safety precautions are undertaken during Yes AS PER GUIDELI4ES construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 |Whether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 9hetherant-termite teatment has ber undataker Yes AS PER GUNDELNES for the soil? 3 |Whether fire-fighting arrangements has been No undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on Yes |AS PERGUIDELINES sitelcompleted building as per requirement? 5 Whether precautions are undertaken to avoid air Yes AS PER GUIDELINES Ipollution durnng constructionT Please specity. 6 Whether records of all test reports/results have been No properly kept in the prescribed formats and whether Ithe same are available at. site far. viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes ASPER GUIDELINES |building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 |Any innovative/cost effective/green technology has No been used for improving qualitylenergy efficiency? Please specify. Yoyrs Faithfully Signatyfe of Engineer (Site Supervisor) Name: Pramod Mungikar Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by dTMAHAVIR INFRASTRUCTURE Signature of Promoter Name: Rupesh Prakashchand MuthROPRIETOR Date: Page 3 of 3