FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FORQUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: To, The Rupesh Prakashchand Mutha Aurangabad (M Corp.), Aurangabad, Aurangabad, 431007 Quality Assurance Certificate (Certificate No. .for the Year Ending ........... ...) Subiect: Certificate for quality of materials used and quality of Construction and workmanshjp of the work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 being developed by Rupesh Prakashchanc1 Mutha Sir, I/We .... ............. have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certficate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and /or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes BY STRUCTURAL TEAM conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 |Whether Structural Engineer has been appointed for Yes Name: NIRANJAN MULEY the project? JLicense No: STATE/R/2025/APL/16697 Mobile: 9960869474 E-mail: muley.niranjan@gmail.com 3 Whether the inspection registers, site order book Yes AS PER GUIDELINES and quality control test registers are maintained at |the site properly and endorsed by the Engineer-in |Charge? 4 Whether testing facilities to check quality of material No is available at site? Page 1 of 3 Parameters Yes/No Remarks Sr. No. Whether the statuary provisions for disaster Yes AS PER RCC ENGINEER DRAWINGS 5 resistancelearthquake resistant design have been incorporated, specially in case of multi-storeyed construction? Has suitable cognizance been taken on demarcated Yes AS PER GUIDELINES 6 flood lines and appropriate precautions taken for protecting the site from flooding considering local Rooing issues? 2. Input Materials Paaetars YesNNo Aerratss Sr.N. 1 Whether the following buildingmaterials confirm to Yes relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: AS PER SUPPLIER DETALS a) Cement, concieie and covarse aggregate Yes (b) Steel and its alloys Yes |AS PER SUPPLIERDETAILS AS PER SUPPLIER DETAILS (c) Electrical wire, fittings and accessories Yes |AS PER SUPPLIER DETAILS (a) Pumbing and'sanıtary tittings Yes 2 Whether reqular tests of materials and construction No products are being done from accredited labs also? LIf ves., details af such labs 3 Whether manufacturer test certificate for cement, Yes |AS PER SUPPLIER DETAILS steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes FROM GROUND WATER TABLE (ü) Has water been tested and approved by Yes AS PER GUIDELINES Engineer-in-Charge before construction? (ii) Has water been tested subsequently as per Yes NO TESTING DONE AS IT IS GROUND requirement? |WATER 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes AS PER GUIDELINES wiring/connections/lift installation/other electrical installations have been carried out under lauthorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes AS PER GUIDELINES |including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under |authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes |IN CONTRACTORS SCOPE supervision of experienced and skilled professional? Further, whether the workmanship and quality is |satisfactory and up to the mark and the work is within the acceptable and permissible limits of |deviations as per relevant Code of Practice? Page 2 of 3 Parameters Yes/No Remarks Sr. No. Whether remedial measures are undertaken to Yes AS PER GUIDELINES 4 prevent dampness and leakages? If yes, provide details AS PER GUDELNES 5 Whether safety precautions are undertaken durig Yes construction activities for all type of workers? 4. Miscellaneous Parameters Yes/No No Sr. No. Whether third party quality inspection is being No carried out on site duringlafter completion of the works? If yes, provide details. 2 Whether anti-termite treatrment has been udertaken Yes AS PER GUIDELINES for the soil? 3 |Whether fire-fighting arrangements has been No undertaken under supevision of fire consultant? 4 Whether proper signages have been installed on Yes AS PER GUIDELINES site/completed building as per requirement? AS PER GUIDELINES 5 Whether precautions are undertaken to avoid air Yes pollution during construction? Please specify. Whether records of alltest reports/results have been No properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? |AS PER GUIDELINES 7 |Whether all relevant records including sanctioned Yes butding plans,utiity drawings,various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? Any innovative/cost effectivelgreen technology has No |been used for improving qualitylenergy efficiency? Please specify. Yours,Faithfully Signature of Engineer (Site Supervisor) Name: Pramod Mungikar Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and MAHAVJR acçepted INFASTROCTUKE Signature of PromotgPRIETOR Name: Rupesh Prakashchand Mutha Date: Page 3 of 3