ahulthole t assocites architects interior designers Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submited at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 13/o4/es To, RUPESH PRAKASHCHAND MUTHA AURANGABAD, MAHARASHTRA, 431007 having Subject : Certificate of percentage of Work of completion of construction work of 55 HAPPYNEST MahaRERA Registration Number P51500052128 (Only Applicable after project Registartion) being developed by RUPESH PRAKASHCHAND MUTHA Sir, I/We RAHUL THOLE have undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 (Only MUTHA ) Applicable after project Registration, being developed by RUPESH PRAKASHCHAND Real Estate Project | Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid building/Wing of the Real certify that as on the date of this certificate, the Percentage of Work done for each of the Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouttBuilding/Wing Number: Building ANA Tasks/Activity Percentage of Actual Work Sr, No. Done (As on date of the Certificate) (1) (2) (3) Excavation 100.00 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 100.00 5 Stilt Floor 90.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises Sanitary Fitting within the Flat/Premises 0.00 Íst. fir, laxmisankul, nr. sant eknath rang mandir, osmanpura, aurangabad, maha. 431005 ph. : 0240-2341863, cel:+919422202459. rvthole@gmail.com, rahulthole@redifmail.cong. Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOG, Electrical fittings,mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayoutBuilding/Wing Number: Building B/NA Sr. No. Tasks/Activity PercentageDone of Actual Work (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 0.00 3 Podiums (if any) Plinth, 0.00 5 stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises Sanitary Fitting within the Flat/Premises 0.00 Staircases. lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmen/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/VWing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anyother activities. Layout/BuildingWing Number: Building C/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 Plinth 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 95.00 8 Sanitary Fitting within the Fat/Premises 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 100.00 |CFO NOC, Electrical fittings, mechanical eguipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wal and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayoutBuilding/Wing Number: Building D/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) Sr. No. Tasks/Activity Percentage of Actual Work Excavation (As on date Done of the 2 Basements (if any) 100.00 Certificate) 3 Podiums (if any) 100.00 4 Plinth, 0.00 Stilt Floor 100.00 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, 100.00 Flats/Premises Floors and windows within 100.00 Sanitary Fitting within the Flat/Premises Staircases, lifts Wells and Lobbies at each Floor 95.00 |Underground Water Tanks level Overhead and 100.00 10 External plumbing and external plaster, elevation, waterproofing of the Building/wing. completion of terraces with 100.00 11 Installation of Lifts, water pumps, Fire Fighting Fittings |CFO NOC, Electrical fittings, mechanical and Equipment as per 100.00 equipment, environment/CRZ NOC, Finishing to entrance lobby/s,compliance to conditions of areas appurtenant to Building/Wing, Compound Wall plinth protection,paving of |as may be required to complete project as per and all other requirements Sale. Any other activities. specifications in agreement of LayouttBuilding/VWing Number: Building E/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) 1 Excavation (3 2 100.00 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 5 100.00 Stilt Floor 6 100.00 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 95.00 |Sanitary Fitting within the Flat/Premises 95.00 |Staircases, lifts Wells and Lobbies at each Floor level Overhead and |Underground Water Tanks 100.00 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 100.00 CFO NOC, Electrical fittings. mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: Building FINA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt FlOor 70.00 6 Slabs of Super Structure 0.00 7 Internal walls, internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises |Sanitary Fitting within the Fla/Premises 0.00 9 Staircases, ifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. Sr. No. Tasks/Activity PercentageDone of Actual Work (As on date of the Certificate) 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Ány other activities. Layout/Building/Wing Number: Building G/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 Basements (if any) 100.00 Podiums (if any) 0.00 Plinth, 100.00 5 Stilt Floor 100.0O 6 |Slabs of Super Structure 100.00 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 |Underground Water Tanks 100.00 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 100.00 CFO NOG, ElecCtricai mechanical equipment, compliance to conditions of environment/CRZ NOC,ugtronce lobbv/s. plinth protection,paving o areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B -Common Areas (Internal and External Development Works) in respect of Registered Phase /Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 52.00 INTERNAL PROJECT TAR I CEMENT ROADS 2 |Water Supply Yes 70.00 FROM BORE WELL 3 Sewerage (Chamber, Lines, Septic Tank,STP) Yes 45.00 DRAINAGE LINE TILL CORPORATIO N LINE 4 Storm Water Drains No 0.00 NA 5 |Landscaping & Tree Planting Yes 70.00 INTERNAL PROJECT TREE PLANTATION 6 Street Lighting Yes 65.00 INTERNAL PROJECT STREET LIGHTS 7 Community Buildings No 0.00 NA 8 |Treatment And Disposal Of Sewage And Sullage VWater No 0.00 NA Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 65.00 RAIN WATER HARVESTING AS PER NORMS 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station No 0.00 NA 14 |Aggregate area of recreational Open Space Yes 0.00 AS PER PLAN 15 |Open Parking No 0.00 NA Nofe. cerkhoade is issued aed Jthole The Yours Faithfully on the ste progres argien no. CAI9T RAHUL THOLE Signature & Name (IN BLOCK LETTERS)of L.S/Architect (License No: CA97/21257) Date of Certificate: Agreed and accepted MAHAVIŘ INFRAST Signature of Promoter PROPRIETOR Name: Rupesh Prakashchand Mutha Date: