ahulthole & associaes Ticl architects interior designers Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:(4- -2026. To, RUPESH PRAKASHCHAND MUTHA AURANGGABAD, MAHARASHTRA, 431007 Subject : Certificate of percentage of Work of completion of construction work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 (Only Applicable after project Registartion) being developed by RUPESH PRAKASHCHAND MUTHA Sir, IWe RAHUL THOLE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 (Only Applicable after project Registration, being developed by RUPESH PRAKASHCHAND MUTHA ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Building A/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 90.00 6 Slabs of Super Structure 0.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 |Sanitary Fitting within the Flat/Premises 0.00 fst. ir, laxmi sankul, nr. sant eknath rang mandir, osmanpura, aurangabad, maba, 4314005 gh. :0240-2341863, cel: +91 9422202459. rvthole@gmail.com, rahuithole@redifmail.com Sr. No. Tasks/Activity PercentageDone of Actual Work (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements |as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayoutBuilding/Wing Number: Building B/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1 (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 Slabs of Super Structure 0.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 |Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 |Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 |CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: Building C/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) 3 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises Sanitary Fitting within the Flat/Premises 95.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 |Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 |Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 95.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wíng, Compound Wall and I other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: Building D/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) Page 2 of 5 Sr. No. Tasks/Activity Percentage of Actual Work Done 1 (As on date of the Certificate) Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings. Floors and windows within 100.00 Flats/Premises Sanitary Fitting within the Flat/Premises 95.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 |Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 95.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing,Compound Wall and all other requirements as may Sale. Anybeother required to complete project as per specifications in agreement of activities. Layout/BuildingWing Number: Building E/NA Sr. No. Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 nternal walls, Internal plaster, Floorings, Floors and windows within 95.00 Flats/Premises |Sanitary Fitting within the FlatUPremises 95.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 95.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 95.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: Building FINA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate ) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 Podiums (if any) 0.00 4 Plinth 80.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofingof the Building/wing. Page 3 of 5 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOG, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to complete project as per specifications in agreement of Sale. Ånyother activities. Layout/BuildingWing Number: Building G/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 0.00 3 Podiums (if any) Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 100.00 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 100.00 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other reguirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 4 of 5 able B - CommonAreas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Work Done Details (Yes / No) (As on date of the Certificate) (1) (2) 1 (3) (4) (5) Internal Roads & Footpaths 40.00 Yes INTERNAL PROJECT TAR /CEMENT ROADS 2 |Water Supply Yes 65.00 FROM BORE WELL 3 Sewerage (Chamber, Lines, Septic Tank, STP) Yes 35.00 DRAINAGE LINE TILL CORPORATIO N LINE 4 Storm Water Drains No 0.00 NA 5 |Landscaping&Tree Planting Yes 70.00 INTERNAL PROJECT TREE PLANTATION 6 Street Lighting Yes 55.00 INTERNAL PROJECT STREET LIGHTS 7 Community Buildings No 0.00 NA Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 45.00 RAIN WATER HARVESTING AS PER NORMS 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station No 0.00 NA 14 Aggregate area of recreational Open Space Yes 0.00 AS PER PLAN 15 Open Parking No 0.00 NA 16 Club House Yes a ahu/ tho NOTE Be cerhfeale is tsseued based on Yours Faithfully the sieeports /decunent fresarted o, RAHUL THOLE Assuer Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No: CA/97/21257) Date of Certificate: MAAKIRPRROAÞyRUCTURE Signature of PromoetOPRIETOR Name: Rupesh Prakashchand Mutha Date: Page 5 of 5