nalul lole and amociates architects. interior designers 1st floor, laxmi sankul, near sant eknath rang mandir, usmanpura, aurangabad 423001 info@rahultholearchitects. com mobile: 9422202459 Annexure A FORM 1 (See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 13-10-2025 To, MAHAVIR INFRASTRUCTURE - PROP. RUPESH PRAKASHCHAND MUTHA, FIRST FLOOR, PLOT NO 7, RH NO 82, BLUE BELLS, NEAR PR0ZONE MALL, MIDC CHIKALTHANA, CHHATRAPATISAMBHAJI NAGAR Subject: Certificate of Percentage of Completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 being developed by MAHAVIR INFRASTRUCTURE PROP. RUPESHPRAKASHCHAND MUTHA. Sir, I/We RAHUL THOLE & ASSOCIATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 being developed by MAHAVIR INFRASTRUCTURE - PROP. RUPESH PRAKASHCHAND MUTHA. Based on the Site Inspection,with respect to the Layout /each BuildingWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building Wingof the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST_BUILDING A S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 0% 2 Basements (if any) 0% 3. Podiums (if any) 0% 4. Plinth 0% 5 Stilt Floor 0% 6 Slab of Super Structure 0% 7. Internal Walls, Internal Plaster, Floorings, Doors,windows within 0% Flats / Premises 8. Sanitary Fittings within Flats/ Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 0% Terraces, with waterproofingof the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings,Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout /Building / Wing Number of 55 HAPPYNEST BUILDING B S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 0% 2. Basements (if any) 0% 3 Podiums (if any) 0% 4 Plinth 0% 5. Stilt Floor 0% 6. Slab of Super Structure 0% 7. InternalWalls, Internal Plaster, Floorings, Doors,windows within 0% Flats / Premises Sanitary Fittings within Flats/ Premises 0% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment/ CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout /Building / Wing Number of 55 HAPPYNEST BUILDING C S. No. Tasks / Activity Percentage of Actual Work Done (As ondate of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within 100% Flats /Premises 8 Sanitary Fittings within Flats / Premises 95% Staircases, Lift Wells & Lobbies at each Floor Level Overhead 100% and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 100% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 95% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment/ CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST_ BUILDING D S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 100% Flats / Premises 8 Sanitary Fittings within Flats / Premises 95% Staircases, Lift Wells & Lobbies at each Floor Level Overhead 100% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 100% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 95% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building /Wing Number of 55 HAPPYNEST BUILDING E S. No. TasksI Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) Podiums (if any) Plinth 100% 5. Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 70% Flats / Premises 8 Sanitary Fittings within Flats / Premises 60% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 100% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 50% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 60% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment /CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout /Building / Wing Number of 55 HAPPYNEST BUILDING F S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2 Basements (if any) 3. Podiums (if any) 4 Plinth 80% 5 Stilt Floor 0% 6 Slab of Super Structure 0% 7. Internal VWalls, Internal Plaster, Floorings, Doors, windows within 0% Flats /Premises Sanitary Fittings within Flats / Premises 0% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings,Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobbyls, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout /Building /Wing Number of 55 HAPPYNEST BUILDING G S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% coo 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats /Premises Sanitary Fittings within Flats / Premises 100% 95% Staircases, Lift Wels &Lobbies at each Floor Level Overhead 100% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 95% Terraces, with waterproofing ofthe Building / Wing 11. Installation of Lifts,Water Pumps, Fire Fighting Fittings and 100% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection,Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) of 55 HAPPYNEST_ BUILDING Ato G S. No. Common Areas & Facilities Proposed Percentage of Details (Yes / NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths YES 10% INTERNAL PROJECT TARI CEMENT ROADS 2 Water Supply YES 30% FROM BORE-WELL 3 Sewerage (Chamber, Lines, YES 10% DRAINAGE LINE TILL Septic Tank, STP) CORPORATION LINE 4 Strom VWater Drains NO N.A. 5 Landscaping &Tree Planting YES 60% INTERNAL PROJECT TREE PLANTATION 6 Street Lighting YES 10% INTERNAL PROJECT STREET LIGHTS 7 Community Buildings NO N.A. 8 Treatment &Disposal of NO N.A. Sewage and Sullage Water 9 Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain YES 10% RAIN WATERHARVESTING AS Water Harvesting PER NORMS 11. Energy Management NO N.A 12. Fire Protection & Fire Safety NO N.A. requirements 13. Electrical Meter Room, Sub YES 0% AS PER MSEB NORMS Station, Receiving Station