nalul hole and aeciates architects. interior designers 1st floor, laxmi sankul, near sant eknath rang mandir, usmanpura, aurangabad.423001 info@rahultholearchitects.com mobile: 9422202459 Annexure A FORM1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 12-07-2025 To, MAHAVIR INFRASTRUCTURE - PROP. RUPESH PRAKASHCHAND MUTHA, FIRST FL0OR, PLOT NO 7,RH NO 82, BLUE BELLS, NEAR PROZONE MALL, MIDC CHIKALTHANA, CHHATRAPATISAMBHAJI NAGAR Subject: Certificate of Percentage of Completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 being developed by MAHAVIR INFRASTRUCTURE- PROP. RUPESH PRAKASHCHAND MUTHA. Sir. |/We RAHUL THOLE & ASsoCIATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 55 HAPPYNEST having MahaRERA Registration Number P51500052128 being developed by MAHAVIR INFRASTRUCTURE PROP. RUPESH PRAKASHCHAND MUTHA. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST_BUILDING A S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0% 2. Basements (if any) 0% 3 Podiums (if any) 0% 4 Plinth 0% 5 Stilt Floor 0% 6 Slab of Super Structure 0% 7 InternalWalls, Internal Plaster, Floorings, Doors, windows within 0% Flats / Premises Sanitary Fittings within Flats /Premises 0% Staircases, Lift Wells &Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST_ BUILDING B S. No. Tasks IActivity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0% 2 Basements (if any) 0% 3 Podiums (if any) 0% 4. Plinth 0% 5 Stilt Floor 0% Slab of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within 0% Flats /Premises Sanitary Fittings within Flats / Premises 0% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installationof Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building /Wing Number of 55 HAPPYNEST BUILDING C S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 100% Flats / Premises 8 Sanitary Fittingswithin Flats / Premises 70% 9 Staircases,Lift Wells &Lobbies at each Floor Level Overhead 90% and Underground Water Tanks 10. External Plumbing 8& External Plaster, Elevation, Completion of 85% Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 70% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound VWall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout /Building /Wing Number of 55 HAPPYNEST BUILDING D S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 90% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 15% Flats / Premises Sanitary Fittings within Flats / Premises 5% Staircases, Lift Wells & Lobbies at each Floor Level Overhead 90% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 100% Terraces, with waterproofing of the Building/Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFONOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall andal other requirements as may be required to complete Project as per specificationsto Agreement of Sale, Any other Activity TABLE-A Layout /Building /Wing Number of 55 HAPPYNEST BUILDING E S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2 (3) 1 Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 85% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within 15% Flats /Premises 8 Sanitary Fittings within Flats /Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 80% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation,Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts,Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST_ BUILDING F |S. No. Tasks I Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2. Basements (if any) 3 Podiums (if any) 4 Plinth 70% 5 Stilt Floor 0% 6 Slab of Super Structure 0% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 0% Flats /Premises 8. Sanitary Fittings within Flats / Premises 0% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10 External Plumbing &External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment/ CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A Layout / Building / Wing Number of 55 HAPPYNEST BUILDING G S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2. Basements (if any) 3 Podiums (if any) 4. Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 80% Flats / Premises Sanitary Fittings within Flats/ Premises 70% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead 85% and Underground Water Tanks 10. External Plumbing &External Plaster, Elevation, Completion of 70% Terraces, with waterproofing of the Building / Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 70% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) of 55 HAPPYNEST BUILDING A to G S. No. Common Areas & Facilities Proposed Percentage of Details (Yes /NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads &Footpaths YES 5% INTERNAL PROJECT TARI CEMENT ROADS 2 Water Supply YES 25% FROM BORE-WELL 3 Sewerage (Chamber, Lines, YES 5% DRAINAGE LINE TILL Septic Tank, STP) CORPORATION LINE 4. Strom Water Drains NO N.A. 5. Landscaping &Tree Planting YES 55% INTERNAL PROJECT TREE PLANTATION 6. Street Lighting YES 5% INTERNAL PROJECT STREET LIGHTS 7. Community Buildings NO N.A. 8. Treatment &Disposal of NO N.A. Sewage and Sullage Water 9. Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain YES 5% RAIN WATER HARVESTING AS