nakul thole and asociates architects. interior designers 1st flocr, laxmi sankul, near sant eknath rang mandir. usmanpura. aurangabad423001 nfo@rahulthoiearchitects com mobile: 9422202459 5Annexure A FORM1 |See Regulation 3] ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 20-07-24 To, Rupesh Prakashchand Mutha H.No: lst Floor Plot No 07, RH No 82, Blue Bells Street, Near Prozone Mall, Chikalthana MIDC, Aurangabad . Subject: Certificate of Percentage of Completion of Construction Work of 55 HAPPYNEST having (MAHA RERARegistration Number P51500052128) being Developed by Rupesh Prakashchand Mutha. Sir, IRupesh Prakashchand Mutha have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 55 HAPPYNEST (MAHA RERA Registration Number P51500052128) being Developed by Rupesh Prakashchand Mutha. Building Based on the Site Inspection, with respect to the Layout / each /Wing of the aforesaid Real Estate Project, I certify that as on date of Building / this Certificate, the Percentage of Work Done for each of the Wing of the Real Estate Project under MAHA RERA Registration Number P51500052128 is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase / Building A to G is detailed in Table-B. ahu hole re * CAV9712 TABLE-A Building A Sr. Tasks IActivity Percentage of Actual Work No. Done (As on date of the Certificate) Excavation Plinth Stilt / ground floor 4 Slab of Super Structure 5 Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows 8 Tilework ( wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development , Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity BuildingB Tasks / Activity Percentage of ActualWork Sr. Done (As on date of the No. Certificate) Excavation 2 Plinth uooooo 3 Stilt / ground floor Slab of Super Structure 5 Internal Walls and Internal Plaster External wall and external plaster 7 Doors and windows Tilework ( wall and floor tiles) 9 Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity thole ho CA/97 BuildingC Percentage of Actual Work Sr. Tasks IActivity Done (As on date of the No. Certificate) 100% 1 Excavation 100% Plinth 100% Stilt /ground floor 80% Slab of Super Structure Internal Walls and Internal Plaster 20% 5 External wall and external plaster 10% Doors and windows 10% 7 Tilework (wall and floor tiles) 10% 10% Plumbing and sanitary Overhead and Underground Water Tanks 50% 10 Completion of Terraces with waterproofing 10% 11 12 Site development Compound Wall and alI other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building D Percentage of Actual Work Sr. Tasks / Activity Done (As on date of the No. Certificate) 100% 1 Excavation 100% 2 Plinth Stilt /ground floor 100% 3 Slab of Super Structure 30% 4 5 Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows 8 Tilework (wall and floor tiles) Plumbing and sanitary 50% 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Tahul) hole CAJ9712 Building E Sr. Tasks / Activity Percentage of Actual Work Done (As ondate of the No. Certificate) Excavation 100% 2 Plinth 100% 3 Stilt / ground floor Slab of Super Structure 5 Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows Tilework ( walland floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development , Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building F Sr. Tasks I Activity Percentage of ActualWork Done (As on date of the No. Certificate) 1 Excavation 100% 50% 2 Plinth 3 Stilt /ground floor Slab of Super Structure 5 Internal Walls and Internal Plaster External wall and external plaster 7 Doors and windows Tilework ( wall and floor tiles) Plumbingand sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity ah CAV9712 Building G Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) 100% 1 Excavation 2 Plinth 100% 3 Stilt / ground floor 100% 100% 4 Slab of Super Structure 100% 5 Internal Walls and Internal Plaster External wall and external plaster 50% 7 Doors and windows Tilework (wall and floor tiles) 9 Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development , Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity rahu hole CA/9712 no. TABLE-B (Internal &External Development Works in respect of the Registered Phase) Proposed Percentage of actual Work Details S. Common Areas & Facilities No. (Yes /NO) Done (As on date of Certificate) YES Not yet started 1. Internal Roads & Footpaths YES Not yet started 2. Water Supply YES Not yet started 3 Sewerage (Chamber, Lines, Septic Tank, ) NO NA 4 Strom Water Drains YES Not yet started 5. Landscaping &Tree Planting YES Not yet started 6 Street Lighting NO NA 7 Community Buildings NO NA 8 Treatment & Disposal of Sewage and Sullage Water NO NA 9. Solid Waste Management & Disposal YES Not yet started 10. Water Conservation / Rain Water Harvesting NO NA 11. Energy Management NO NA 12. Fire Protection & Fire Safety requirements NA 13. Electrical Meter Room, Sub NO Station, Receiving Station 14. Others (Option to Add more) Do. CA/97 Yours faithfully, ahu thole A/97 Ar. Rahul Thole License Number: CA/97I21257 Agreed &Accepted by: Signature of Promoter Name: RUPESH PRAKASHOCHAND MUTHA. Date: