nalul lole and nocistes architects. interior designers Ist floor, laxmi sankul near sant eknath rarg mandir, usmangura, aurargabad 423001 info @rahultholearchitects com moble 9472212459 5Annexure A FORM1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 20-04-24 To, Rupesh Prakashchand Mutha, H.No: lst Floor Plot No 07, RH No 82, Blue Bells Street, Near Prozone Mall,Chikalthana MIDC, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of 55 HAPPYNEST having (MAHA RERA Registration Number P51500052128) being Developed by Rupesh Prakashchand Mutha. Sir, IRupesh Prakashchand Mutha have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 55 HAPPYNEST (MAHA RERA Registration Number P51500052128) being Developed by Rupesh Prakashchand Mutha. Based on the Site Inspection, with respect to the Layout / each Building /Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate,the Percentage of Work Done for each of the Building / Wing of the Real Estate Project under MAHA RERA Registration Number P51500052128 is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase / Building A to G is detailed in Table-B. TABLE-A Building A Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) 1 Excavation 2 Plinth 3 Stilt / ground floor 4 Slab of Super Structure 5 Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows Tilework (wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground VWater Tanks 11 Completion of Terraces with waterproofing 12 Site development Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building B Sr. Tasks I Activity Percentage of Actual Work No. Done (As on date of the Certificate) 1 Excavation 2 Plinth 3 Stilt / ground floor Slab of Super Structure 5 Internal Walls and Internal Plaster 6 External wall andexternal plaster 7 Doors and windows 8 Tilework ( wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development , Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building C Sr. Tasks / Activity Percentage of ActualWork No. Done (As on date of the Certificate) 1 Excavation 100% 2 Plinth 100% 3 Stilt /ground floor 10% Slab of Super Structure 10% 5 Internal Walls and Internal Plaster 10% 6 External wall and external plaster 5% 7 Doors and windows 10% Tilework ( walland floor tiles) 10% Plumbing andsanitary 10% 10 Overhead and Underground Water Tanks 50% 11 Completion of Terraces with waterproofing 10% 12 Site development Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building D Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) Excavation 100% 2 Plinth 100% 3 Stilt / ground floor Slab of Super Structure 5 Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows 8 Tilework ( wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 50% 11 Completion of Terraces with waterproofing 12 Site development , Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building E Sr. Tasks / Activity Percentage of ActualWork No. Done (As on date of the Certificate) Excavation 100% 2 Plinth 100% 3 Stilt / ground floor 4 Slab of Super Structure 5 Internal Walls and Internal Plaster External walland external plaster 7 Doors and windows Tilework (wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 50% 11 Completion of Terraceswith waterproofing 12 Site development Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Building F Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) 1 Excavation 100% Plinth 100% 3 Stilt / ground floor 4 Slab of Super Structure Internal Walls and Internal Plaster 6 External wall and external plaster 7 Doors and windows 8 Tilework (wall and floor tiles) Plumbing and sanitary 10 Overhead and Underground Water Tanks 50% 11 Completion of Terraces with waterproofing 12 Site development Compound Wall and al| other requirements as may be required to complete Project as per specificatiorns to Agreement of Sale, Any other Activity Building G Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) Excavation 100% 2 Plinth 100% 3 Stilt / ground floor 100% Slab of Super Structure 75% 5 Internal Walls and Internal Plaster 6 External walland external plaster 30% 7 Doors and windows 8 Tilework (wall and floor tiles) 9 Plumbing and sanitary 10 Overhead and Underground Water Tanks 11 Completion of Terraces with waterproofing 12 Site development Compound Wall and all| other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B (Internal & External Development Works in respcct of the Registered Phase) S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes /NO) Done (As on date of Certificate) 1. Internal Roads & Footpaths YES Not yet started 2 Water Supply YES Not yet started 3 Sewerage (Chamber, Lines, YES Not yet started Septic Tank, ) 4 Strom VWater Drains NO NA 5 Landscaping &Tree Planting YES Not yet started 6. Street Lighting YES Not yet started 7. Community Buildings NO NA 8 Treatment &Disposal of Sewage NO NA and Sullage Water 9 Solid Waste Management & NO NA Disposal 10. Water Conservation / Rain Water YES Not yet started Harvesting 11. Energy Management NO NA 12. Fire Protection & Fire Safety NO NA requirements 13. Electrical Meter Room, Sub NO 0 NA Station, Receiving Station 14. Others (Option to Add more) Scanned with CamScanner