Annexure A FOR]U 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale:10-O7 -2024 To, PARAM DEVELOPERS, 14, SHYAM CHAMBERS, BANSILAL NAGAR, RAILWAY STATION ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of PARAM SUVARNVASTUhaving MahaRERA Registration Number P51500052126bein9 developed by PARAM DEVELOPERS. (For Apr to Jun 2024 QTR) Sir, I / We ARCH PRAMOD NARALEhave undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of PARAM SUVARNVASTU having MahaRERA Registration Number P51500052126 being developed by PARAM DEVELOPERS. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingANing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A / Bui Number FOR PARAM SUVARNVASTU - ryPE A ROW HOUSE S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100o/o J X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure 100% t) lnternal walls, lnternal Plaster, Floorings within 100o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100% Fittings within the FlaUPremises a Staircases, Lifts Wells and Lobbies at each Floor level 800k connecting Staircases and Lifts, Overhead and Underqround Water Tanks. The external plumbing and external plaster, elevation, 80% completion of terraces with waterproofing of the BuildingANing 10 I nstall ation of lift s, water pum ps, F*c-FigfitingrEifirgs 80% Electrical fittings to "r++trq€ipmef+€4peFe,F+Ne€, Common Areas, electro, ing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occuoation /Comoletion Certilicate TABLE-A Number FOR PARAM SUVARNVASTU - TYPE B ROW HOUSE S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% J X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 100o/o 6 lnternal walls, lnternal Plaster, Floorings within 100o/o Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaVPremises, Electrical 100o/o Fiftings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 80o/o connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The external plumbing and external plaster, elevation, 80% completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps, ffiigihtingrfittings 7Oo/o a@, Electrical fittings to Cdmmon Areas, electro, rn€€haftic+equipmerit, c@NoC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A Layout / Building / Wing Number FOR PARAM SUVARNVASTU - TYPE C ROW HOUSE s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) t2t (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor ( X number of Slabs of Super Structure 100% 6 lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 90% Fittings within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor level 80o/o connecting Staircases and Lifts, Overhead and Underoround Water Tanks. o The external plumbing and external plaster, elevation, 80% completion of terraces with waterproofing of the Building/Wing '10 lnstallation of lifts, water pumps, FirsFightinE Fittlf$s 750/o , Elechical fittings to Common Areas, electro, mc€frrnicefEq-ufFmeni: com Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occuoation /Comoletlon Certiflcate TABLE.A B Number FOR PARAM SUVARNVASTU - WING D S. Tasks i Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0o/o 2 X number of Basement(s) and Plinth 0% 3 X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 0o/o o lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaVPremises, Electrical 0o/o Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, elevation, 00k completion of terraces with waterproofing of the BuildingANing 10 I nstall ation of ift s, water pum ps, FireEightingfittings. I 0o/o anrt Fquipment as per e -O N@C, Electrical fittings to Common Areas, electro, mech€ni€alequipri-dnt, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation iCompletion Certificate TABLE.A Buildinq / Wino Number FOR PARAM SUVARNVASTU - WING E S. Tasks / Activity Percentage of Actual Work No. Oone (As on date of the Certificate) (1) (21 (3) 1 Excavation lYo 2 X number of Basement(s) and Plinth Oo/o J X number of Podiums 4 Stilt Floor A X number of Slabs of Super Structure Oo/o 6 lnternal walls, lnternal Plaster, Floorings within o% Flats/Premises, Doors and Wndows to each of the Flat/Premises 7 Sanitary Fittings within the FlaVPremises, Electrical 0o/o Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingANing 10 I nstal ation of lift s, water pu m ps, Fire{=igrhtingFFitting€- I Oo/o an@ Electrical fittings to Common Areas, electro, rneenanie+equiementr- Co Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildinq/Winq, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B Common Areas (lnternal & External Development Works) FOR PARAM SUVARNVASTU - TYPE A, B & C ROW HOUSE, WING D, WING E S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (21 (3) (4) (5) 1. Internal Roads-& Footpaths : YES 0% lnternal Cement Roads 2. Water Conservation, Rain water YES 0o/o Rain Water Harvesting As Harvestinq: Per Norms J. Enerov manaqement : NO NA 4. Fire Protection And Fire Safety NO NA Requirements: 5. Electrical Meter Room, Sub- YES ook As Per MSEB Norms Station, Receivinq Station : 6. Aggregate area of recreational YES 0% Open Space Open Space : 7. Open Parkinq : NO NA 8. Water SuoDlv : YES 1Qo/o From Well Sewerage (Chamber, Lines, YES 0 Drainage Line Till Seotic Tank . STP) : Corporation Line 10. Storm Water Drains : NO NA 11 Landscaoino & Tree Plantinq : YES Oo/o Tree Plantation 12. Street Lighting : YES o% Street Lights For lnternal Proiect tJ. Community Buildinqs : NO NA 14. Others (Option to Add more) NO NA Yours faithfully, & Name (lN BLOCK LETTERS) of Land Surveyor / Architect LicenseNumber (---------------) Agreed & Accepted by: KMmPsn.u ar.Promod Vllhobo Norore ffi 6f\{ a ( sEAr-i; --v;#ry Name:PARAM DEVELOPERS Dale:10-07-2024