Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:10-1G2023 To, PARAM DEVELOPERS, 14, SHYAM CHAMBERS, BANSILAL NAGAR, RAILWAY STATION ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of PARAM SUVARNVASTUhaving MahaRERA Registration Number P5'1500052126bein9 developed by PARAM DEVELOPERS. (For Jul to Sep 2023 QTR) Sir, I / We ARCH. PRAMOD NARALEhave undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of PARAM SUVARNVASTU having MahaREM Registration Number P51500052126 being developed by PARAM DEVELOPERS. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaREM is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table.B. TABLE.A Wino Number FOR PARAM SUVARNVASTU . TYPE A ROW HOUSE S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100o/o 2 X number of Basement(s) and Plinth 2oo/o 3 X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 0% o lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaVPremises, Electrical 0% Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connecting Staircases and Lifts, Overhead and Underqround Water Tanks. I The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps, F*€-FightingFF*tings 0% anO-equfrnent asaer€FO+OG Electrical fittings to Common Areas, electro, mecm-eguipmcnt, , Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain OccuDation /Completion Certifi cate TABLE.A Bui Number FOR PARAM SUVARNVASTU . TYPE B ROW HOUSE S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 20o/o J X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within lYo Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0o/o Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps, PhsFQhting+itting$- Oo/o to Common Areas, electro, mee@uiprnent, Co Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAlVing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE.A / Quilding / Wing Number FOR PARAM SUVARNVASTU - TypE C ROW HOUSE s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) 12 (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 20% J X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0% Fittings within the FlaUPremises a Staircases, Lifts Wells and Lobbies at each Floor level lYo connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and eliternal plaster, elevation, 0o/o completion of terraces with waterproofing of the BuildingA/Ving 10 pumps,fffi lnstallation of lifts, water 0% 2tC Equipment as per GFO+{OC, Electrical fittings to Common Areas, electro, nreeha#ealerquprnenf Compliancef itionsoFe-vironnre-,1l€Rz-+{O€, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A Building / Winq Number FOR PARAM SUVARNVASTU - W|NG D S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 0o/o 3 X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure ook 6 lnternal walls, lnternal Plaster, Floorings within ja/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical Oo/o Fittinos within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level ooa connecting Staircases and Lifts, Overhead and Underoround Water Tanks. o The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingANing 10 Installation of lift s, water pumps"E{re#ightingrF'ittings 0% @Electrical fittings to Common Areas, electro, rnceaanieatequipmer*r QornpliancgffiitionsuieFvirc)^ment /CRz Neq Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A Number FOR PARAM SUVARNV 'ASTU - WING E S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 10Oo/o 2 X number of Basement(s) and Plinth 0% X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure Oo/o 6 lnternal walls, lnternal Plaster, Floorings within Oo/o Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0% Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level lYo connecting Staircases and Lifts, Overhead and Underqround Water Tanks. a The external plumbing and external plaster, elevation, 0o/o completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps,f#e€igrhtingrFittings 0o/o a@, Electrical fittings to Common Areas, electro, m€effiequiplnef,t, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation iCompletion Certifi cate TABLE.B Common Areas (lnternal & External Development Works) FOR PARAM SUVARNVASTU -TYPE A, B & C ROW HOUSE, WNG D, WING E S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (2\ (3) QI (5) 1 I ntcrpel8€€HFootpath s: YES Oo/o lnternal Cement Roads Water Conservation, Rain water YES 0o/o Rain Water Harvesting As Harvestino: Per Norms Enerqy manaqement : NO NA 4. Fire Protection And Fire Safety NO NA Requirements: Electrical Meter Room, Sub- YES lYo As Per MSEB Norms Station, Receivinq Station : b. Aggregate area of recreational YES Oo/o Open Space Open Space : 7. Ooen Parkino : NO NA 8. Water Supplv : YES 100k From Well 9. Sewerage (Chamber, Lines, YES 0 Drainage Line Till Seotic Tank . STP) : Corporation Line 10. Storm Water Drains : NO NA 11 Landscapinq & Tree Plantinq : YES 0o/o Tree Plantation 12. Sheet Lighting : YES 0o/o Street Lights For lnternal Proiect 13. Communitv Buildinqs : NO NA 14. Others (Option to Add more) NO NA Yours faithfully, Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number Agreed & Accepted by: ill -#cJ- Signature of Promoter i A-/ I /i Name:PARAM DEVELOPERS ) Date:10-10-2023