Er. SRcUIN SH!RsAT Civil Engg Annexure C FORM - 2A (See MahaRER{ Order No. 5 of2018) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor,s Certifi cate) (To be submitted at the end of Financial year) Date:10-04-2024 To, NAVBHABAT BUILDEBS, PLOT NO 54, NS 1 CIOCO, SHIVAJI NAGAR, AURANGABAD. 02 QUALITY ASSURANCE CERTIFICATE (Certificate No for the year Ending 2023 _ 241 subject: certificate for quality materials used and quality of construction & workmanship for the work of LABH A,ARTMENTS having MahaRERA Regrstration Number pS1500052967 being devetoped by NAVBHA;AT BUTLDERS Sir, l/ we Er SACHIN sHlRsAT have underlaken an assignment of supervision or tnis Rejt Estate Project. OUH RESPONSIBILITY l/ we are responsibre for carrying out the work .n accordance with that with deveropment permisston and as per the approved plan and submtt certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBc and/or other rerevant code of practice. 11] INPUT MATERIALS, FIXTURES & FITTINGS l/ we hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electricar, sanitary Fittings, etc and amenities to be provided by the promoter in the said project, bullding and the Apartment as are as per spectfrcations mentioned in Annexure.E,, of A0reement to Sale. For those items, where no specification have been mentioned in Agreement ol Sale, the Materials, Fixtures and Fittings used conform to the relevant BIS Slandard / lS / National Building Codes or as per lndustry Standards. rr. SacHlru Sntnsnr Civil Engg 12) WoRKMANSHIP l/ we hereby certify that the work has been carried out under our supervision. we further certjfy that workmanship and quarity is satisfactory and up to the mark and the work has been acceptabre within the permissible rimits of devration as per rerevant code of practrce. 13] STRUCTUBALENGINEER Promoters have engaged structu ral engineer Er SACHIN SHIRSAT having License No having Office at Chhatrapati Sambhaji Nagar. The structural design of buirdings in this project has been done under his supervision. The formwork and concrete mix design has been done as per rs 10262:2009 oi as per other relevant codes as applicabre, His periodic checks and certificates for srABrLrry and SAFETY have been kept on record. 15] PRESEBVATION OF BECORDS Record of all test resurts of this project have been properry kept in the prescribed format and wi be preserved at least up to the Defect Liabirity period or frcr the period as required by any other provislon of Law. Please specify deviation in quality ol materiars or any other item of work which were not conforming to the spec,fications as mentioned in Agreemenl of Sale. Yours faithf u lly, Sachin H. Shirsat Iunicipal Lrcon:od Conoulling Engh,act Reg. Ho. TP5/469/2011 2.1, thsribl L!shad.]../ li.:C.lr. Signature of Engineer (Site Supervisor) Sihnkai l.lagar, A:jrtsrlal. a. Name: Er SACHIN SHTBSAT Llcense No (if any): Mobile No: 9175157978 Place: Chhatrapati Sambhaji Nagar Agreed & Accepted by: 6.ax Sig[ature,of Promoter Name: NAVBHARAT BUILDERS %# Date: l0-04-2024